Start-up 75
8
Start-up
Chapter contents
•
(p.
)
•
(p.
•
(p.
•
(p.
•
String configuration assistant (-SX model)
)
•
Programmable relay configuration using FIO-01 module
WARNING!
Only qualified electricians are permitted to do the start-up.
Obey the safety instructions in chapter
.
Before start up
Preliminary procedures
Make sure that the mechanical and electrical installation of the inverter is correct. Refer to
chapter
on page
Make sure that the mechanical and electrical installation of the rest of the photovoltaic
(PV) system is finished and inspected.
Make sure that the grid owner (or other local authority) is informed about the planned grid
connection of the photovoltaic (PV) system and that the plan is approved.
Make sure that the PV array gets sufficient sunlight during the start-up procedure.
Although the inverter can be started without daylight, adequate sunlight is needed to
make sure that the PV array and grid feed work correctly.
Содержание PRO-33.0-TL Series
Страница 1: ...ABB solar inverters Product manual PRO 33 0 TL string inverters ...
Страница 4: ......
Страница 10: ...10 Table of contents ...
Страница 32: ...32 Hardware description ...
Страница 40: ...40 Installation requirements ...
Страница 70: ...70 Electrical installation ...
Страница 74: ...74 Installation checklist ...
Страница 110: ...110 Maintenance ...
Страница 134: ...134 Navigation map The navigation map ...
Страница 136: ...Contact us www abb com solarinverters 3AUA0000123261 Rev B EN 2015 06 18 ...