CO M M I SS I O N I N G
—
Commissioning
13
Follow the two steps for the commissioning.
Follow the commissioning procedure as described in the MNS service manual 1TGC902040B0201 section 5.
Exception:
While performing the insulation test on the main busbar system, the fuses of the EMC boards have to be disconnected.
Follow the start-up procedure as described in the DPA 500 user manual section 6.7.
Содержание MNS-Up
Страница 6: ... 01 Introduction ...
Страница 8: ... 02 Safety first ...
Страница 12: ... 03 General technical data ...
Страница 16: ... 04 System description ...
Страница 18: ... 05 Packing storage and transportation ...
Страница 36: ... 06 Transport ...
Страница 40: ... 07 Erecting ...
Страница 47: ...47 ERECTING ...
Страница 48: ... 08 MNS Up configuration ...
Страница 52: ... 09 MNS Up Module installation ...
Страница 55: ...55 MNS UP MODULE INSTALL ATION ...
Страница 56: ... 10 Handling of EMC boards ...
Страница 59: ...59 HANDLING OF EMC BOARDS ...
Страница 60: ... 11 Communication boards ...
Страница 62: ... 12 MNS 3 0 sections ...
Страница 64: ... 13 Commissioning ...
Страница 66: ... 14 Operating of MNS Up system ...
Страница 68: ... 15 Tightening torques for screw connection in MNS Up ...
Страница 72: ... 16 Spare parts ...
Страница 74: ... 17 Onsite inspection and maintenance ...
Страница 76: ... 18 Maintenance intervals ...
Страница 81: ...81 MAINTENANCE INTERVALS ...
Страница 83: ......