46
M N S - U P
SER V I C E M A N UA L
7.6
Battery connection
Battery connection can be done for each 100kW module individually or one complete section.
Battery connections need to be done before the filter modules are installed in the filter section.
7.6.1
Individual batteries
Battery connection bars are provided for each module level.
Figure 7-09 Individual battery connection
7.6.2
Common batteries
In case a common battery set must be connected to one MNS-Up section, the battery connection bars of the different mod-
ule levels need to be connected using copper links.
Figure 7-10
Common battery connection
Содержание MNS-Up
Страница 6: ... 01 Introduction ...
Страница 8: ... 02 Safety first ...
Страница 12: ... 03 General technical data ...
Страница 16: ... 04 System description ...
Страница 18: ... 05 Packing storage and transportation ...
Страница 36: ... 06 Transport ...
Страница 40: ... 07 Erecting ...
Страница 47: ...47 ERECTING ...
Страница 48: ... 08 MNS Up configuration ...
Страница 52: ... 09 MNS Up Module installation ...
Страница 55: ...55 MNS UP MODULE INSTALL ATION ...
Страница 56: ... 10 Handling of EMC boards ...
Страница 59: ...59 HANDLING OF EMC BOARDS ...
Страница 60: ... 11 Communication boards ...
Страница 62: ... 12 MNS 3 0 sections ...
Страница 64: ... 13 Commissioning ...
Страница 66: ... 14 Operating of MNS Up system ...
Страница 68: ... 15 Tightening torques for screw connection in MNS Up ...
Страница 72: ... 16 Spare parts ...
Страница 74: ... 17 Onsite inspection and maintenance ...
Страница 76: ... 18 Maintenance intervals ...
Страница 81: ...81 MAINTENANCE INTERVALS ...
Страница 83: ......