24
M N S - U P
SER V I C E M A N UA L
Do not incline
Fragile
Gravity center
CZ
−
003
HT
I
P
P
C
Marking for ropes
Do not stack
HT IPPC
Figure 5-05 Transport marking
!
All sawn wood shall be thermal treated according ISPM 15 standard.
1. On the base a 2 mm miralon layer is placed and aluminium foil on top of it. Wooden boards and strips are placed
on top of this AL foil.
2. Switchgear shipping section is placed on those wooden boards.
Содержание MNS-Up
Страница 6: ... 01 Introduction ...
Страница 8: ... 02 Safety first ...
Страница 12: ... 03 General technical data ...
Страница 16: ... 04 System description ...
Страница 18: ... 05 Packing storage and transportation ...
Страница 36: ... 06 Transport ...
Страница 40: ... 07 Erecting ...
Страница 47: ...47 ERECTING ...
Страница 48: ... 08 MNS Up configuration ...
Страница 52: ... 09 MNS Up Module installation ...
Страница 55: ...55 MNS UP MODULE INSTALL ATION ...
Страница 56: ... 10 Handling of EMC boards ...
Страница 59: ...59 HANDLING OF EMC BOARDS ...
Страница 60: ... 11 Communication boards ...
Страница 62: ... 12 MNS 3 0 sections ...
Страница 64: ... 13 Commissioning ...
Страница 66: ... 14 Operating of MNS Up system ...
Страница 68: ... 15 Tightening torques for screw connection in MNS Up ...
Страница 72: ... 16 Spare parts ...
Страница 74: ... 17 Onsite inspection and maintenance ...
Страница 76: ... 18 Maintenance intervals ...
Страница 81: ...81 MAINTENANCE INTERVALS ...
Страница 83: ......