1 Introduction
1 Introduction 07
2
Safety first
2.1
Safety relevance 09
2.2
Understanding and managing the risk 09
2.3
Warning signs and labels 10
2.4
Basic principles and precautions to be observed 10
2.5
Areas of work 10
2.6
Five safety rules 11
2.7
Permit to work 11
2.8
Personal Protection Equipment (PPE)
11
2.9
Special considerations when working on electrical equipment
11
2.9.1 Capacitors
11
2.9.2 CT’s
11
2.9.3
Auxiliary or temporary supply
11
3
General technical data
3
General technical data 13
3.1
MNS-Up UPS General characteristics 14
4
System description
4.1
MNS-Up UPS section
17
5
Packing, storage and transportation
5.1 General 19
5.1
Recommended packing methods 22
5.2.1
The packing for normal road transport
22
5.2.2
The seaworthy packing
23
5.2.3
Horizontal transportation
29
5.2.4
Packaging of switchgear components
30
5.3
Handling of switchgear components 30
5.3.1
Circuit breaker
30
5.3.2
Withdrawable modules
30
5.3.3
MNS-Up UPS modules
30
5.3.4
MNS-Up Filter modules
31
5.4
Unloading and transport at site 31
5.4.1
Ground transport
31
5.4.4
Transport by crane
32
5.4.3
Transport by truck
34
5.5
Intermediate storage
34
5.5.1
Storage of spare modules
35
5.6
Enviromental conditions of transport, storage and installation
35
6 Transport
6.1
MNS-Up section 37
6.1.1
Rolling transport
37
6.1.2
Forklift transport
37
6.1.3
Crane transport
38
6.1.3.1 Guide values for permissible rope loading
38
6.2
MNS-Up Modules 39
6.3
Circuit breakers 39
7 Erecting
7.1
Before installation 41
7.1.1
Ambient conditions
41
7.1.2
Floor cutouts
41
Содержание MNS-Up
Страница 6: ... 01 Introduction ...
Страница 8: ... 02 Safety first ...
Страница 12: ... 03 General technical data ...
Страница 16: ... 04 System description ...
Страница 18: ... 05 Packing storage and transportation ...
Страница 36: ... 06 Transport ...
Страница 40: ... 07 Erecting ...
Страница 47: ...47 ERECTING ...
Страница 48: ... 08 MNS Up configuration ...
Страница 52: ... 09 MNS Up Module installation ...
Страница 55: ...55 MNS UP MODULE INSTALL ATION ...
Страница 56: ... 10 Handling of EMC boards ...
Страница 59: ...59 HANDLING OF EMC BOARDS ...
Страница 60: ... 11 Communication boards ...
Страница 62: ... 12 MNS 3 0 sections ...
Страница 64: ... 13 Commissioning ...
Страница 66: ... 14 Operating of MNS Up system ...
Страница 68: ... 15 Tightening torques for screw connection in MNS Up ...
Страница 72: ... 16 Spare parts ...
Страница 74: ... 17 Onsite inspection and maintenance ...
Страница 76: ... 18 Maintenance intervals ...
Страница 81: ...81 MAINTENANCE INTERVALS ...
Страница 83: ......