47/54
MegaFlex 1000 to 1600
UPS Installation Guide / REV-A
5
Connectivity interface
Fig. 5-1 MegaFlex 1000 to 1600 - Connectivity rack and Serial port J35
µ
P – RS232 / J35DSP – RS232
MegaFlex 1000 to 1600 has the following equipment’s:
Serial Port J35
µ
P - RS232 (see Section 5.1).
Serial Port J35DSP - RS232 (only for ABB Service Center).
Customer Interface board (see Section 5.2).
Connectivity rack ready for the installation of four connectivity boards.
XA terminal block (see Section 4.11).
Possible connectivity configurations with MegaFlex 1000 to 1600
Fig. 5-2 Connectivity Slots
For a Single UPS it’s possible to install the following
connectivity boards:
-
max. 3 “Customer Interface” boards;
-
max. 2 “3-ph SNMP/WEB Plug-in Adapter” boards.
For a Parallel System (max. 6 UPS) it’s possible to install
the following connectivity boards:
-
max. 3 “Customer Interface” boards for each UPS;
-
max. 2 “3-ph SNMP/WEB Plug-in Adapter” boards for
RPA Parallel System.
Note!
The installation of any option board must be performed only by an ABB Service Technician.
Prior to the installation, connection and cabling of any option board the UPS must be completely
powered down and all the power sources that will be connected to the option board must be de-
energized.
Option board shall be connected only to Safety Extra Low Voltage circuits (SELV for IEC-UL-
CSA60950-1): voltage up to 30Vac / 42.4Vpk or 60Vdc maximum and galvanically separated from
AC Mains supply.
Keep SELV cables separated from high voltage cables.
Connectivity
rack
MGF_UL_1000
-1600_Connec
tivity rack_01
1
2
E
PO
E P
O
+
-
Q 1
UVR
SNMP
Customer
Interface
J35
DSP
1
2
E
P
O
E
P
O
+
-
Q 1 UVR
J35
µ
P
XA
J35DSP - RS232
XA
J35
µ
P - RS232
Connectivity rack
MGF_UL
_1000-1
600_S1_C
on necti
vity rack
_01
SNMP ca
rd
J3
J2
J5
J4
16
15
4
19
18
17
20
9
8
7
6
5
14
13
12
3
2
1
22
11
2
1
21
10
Custom
er interf
ace