24/54
MegaFlex 1000 to 1600
UPS Installation Guide / REV-A
4.7.1
Cabinets positioning and interconnection for electrical safety grounding
Note!
The “Power Section cabinet” and “In/Out Section cabinet” must be installed on levelled floor.
Mechanical interconnection is essential to ensure the electrical safety grounding of the “Power
Section cabinet”. Failure in grounding generates risks of electric shock.
Fig. 4.7.1-1 MegaFlex 1000 to 1600 – Cabinets positioning and interconnection for electrical safety grounding
In/Out Section cabinet
MGF_UL_1000-160
0_S1_UPS cabinets
_Junction_01US
Junction metal
18 Bolt
M5x12
Bolt torque:
22 Lb-in / 2.5 N-m
Power Section cabinet
Module not available in the
MegaFlex 1000 - 1100 - 1200