27/54
MegaFlex 1000 to 1600
UPS Installation Guide / REV-A
4.7.4
Lower closures with air inlet grids assembling
UPS is delivered with lower closures with air inlet grids to be installed on the bottom of the UPS cabinet, over
standing feet.
Warning!
Such covers compete UPS enclosure and are essential to ensure compliance protection level against
access IP2X.
Failure to install them exposes to risk of electric shock.
Fig. 4.7.4-1 MegaFlex 1000 to 1600 – Lower closures with air inlet grids assembling
Installation sequence of the lower covers with air grids of the UPS cabinet:
-
Assembling the 2 lateral lower covers “
1a
and
1b
”.
-
Assembling the 2 rear lower covers “
2a
and
2b
”.
Note! In case the UPS in located against the wall, the 2 rear covers “
2a
and
2b
” must be assembled before
moving the UPS cabinet.
-
Assembling the 2 front lower covers “
3a
and
4b
”
MGF_UL_1000-
1600_S1_UPS cab
inets_Air grids_01U
S
7 Bolt M5x12
Nut M5
2a
2b
1b
1a
3a
3b
**
**
**
*
*
*
4 Bolt M5x30
**
*