40
M4M 30
NETWORK ANALYZER USER MANUAL
• Channels
It is possible to configure each channel to one of the following parameters, allowing to store one
parameter in each channel. Up to 25 parameters can be selected and stored. Default parameters are
already configured and defined in the M4M for each channel, see details below.
→
→ Historicals → Load profile → Channels
Channels parameters
Channels parameters
Active Power Imp. Tot. (CH1 default value)
Voltage L1 (CH13 default value)
Active Power Imp. L1 (CH2 default value)
Voltage L2 (CH14 default value)
Active Power Imp. L2 (CH3 default value)
Voltage L3 (CH15 default value)
Active Power Imp. L3 (CH4 default value)
Voltage L1-L2 (CH16 default value)
Reactive Power Imp. Tot. (CH5 default value)
Voltage L2-L3 (CH17 default value)
Reactive Power Imp. L1 (CH6 default value)
Voltage L1-L3 (CH18 default value)
Reactive Power Imp. L2 (CH7 default value)
Current L1 (CH19 default value)
Reactive Power Imp. L3 (CH8 default value)
Current L2 (CH20 default value)
Apparent Power Imp. Tot. (CH9 default value)
Current L3 (CH21 default value)
Apparent Power Imp. L1 (CH10 default value)
Current N. (CH22 default value)
Apparent Power Imp. L2 (CH11 default value)
THD Voltage L1
Apparent Power Imp. L3 (CH12 default value)
THD Voltage L2
Active Power Exp. Tot.
THD Voltage L3
Active Power Exp. L1
THD Voltage L1-L2
Active Power Exp. L2
THD Voltage L2-L3
Active Power Exp. L3
THD Voltage L3-L1
Reactive Power Exp. Tot.
THD Current L1 (CH23 default value)
Reactive Power Exp. L1
THD Current L2 (CH24 default value)
Reactive Power Exp. L2
THD Current L3 (CH25 default value)
Reactive Power Exp. L3
THD Current N
Apparent Power Exp. Tot.
Power Factor Tot.
Apparent Power Exp. L1
Power Factor L1
Apparent Power Exp. L2
Power Factor L2
Apparent Power Exp. L3
Power Factor L3
Содержание M4M 30
Страница 1: ...M4M 30 User manual 2CSG445042D0201 Network Analyzer M4M 30 User manual ...
Страница 2: ......
Страница 13: ...M4M 30 NETWORK ANALYZER USER MANUAL 13 4 Installation 4 1 Assembly 4 2 Disassembly 1 2 3 4 1 2 ...
Страница 82: ... ...
Страница 83: ......
Страница 84: ...ABB S p A Electrification business Viale dell Industria 18 20010 Vittuone MI Italy new abb com low voltage ...