
Note
Action
Screws: Hex socket head cap
screw M5x16 12.9 Lafre
2C2B/FC6.9 (4 pcs)
Install the flange to the motor and secure with
screws.
2
Washers: Plain washer 11x5.3x1.2
Steel (4 pcs)
Tightening torque: 5.7 Nm ±10%
xx2100001177
Refitting the axis-2 motor sub-assembly
Note
Action
For robots with protection type Clean Room:
1
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free. See
Cut the paint or surface on the robot
before replacing parts on page 118
Note
After all repair work, wipe the Clean Room robot
free from particles with spirit on a lint free cloth.
xx2100001048
Refit the axis-2 timing belt onto the pulley on the
axis-2 gearbox.
2
Continues on next page
Product manual - IRB 920
787
3HAC075721-001 Revision: C
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.7.2 Replacing the axis-2 motor sub-assembly
Continued
Содержание IRB 920
Страница 1: ...ROBOTICS Product manual IRB 920 ...
Страница 2: ...Trace back information Workspace 22A version a22 Checked in 2022 03 21 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 50: ...This page is intentionally left blank ...
Страница 110: ...This page is intentionally left blank ...
Страница 984: ...This page is intentionally left blank ...
Страница 1000: ...This page is intentionally left blank ...
Страница 1002: ...This page is intentionally left blank ...
Страница 1006: ......
Страница 1007: ......