
Note
Action
xx2100001093
Refit the timing belt to the transmission module.
2
Timing belt, A4-2:
3HAC070471-001
Screws: Hex socket head cap
screw M4x16 12.9 Lafre
2C2B/FC6.9 (4 pcs)
Refit the transmission module flange and secure
with the screws and washers.
3
Washers: Spring washer 9x4.3x1
Steel (4 pcs)
Tightening torque: 3.5 Nm ±10%
xx2100001092
Refitting the transmission module assembly to the outer arm
Note
Action
For robots with protection type Clean Room:
1
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free. See
Cut the paint or surface on the robot
before replacing parts on page 118
Note
After all repair work, wipe the Clean Room robot
free from particles with spirit on a lint free cloth.
Continues on next page
614
Product manual - IRB 920
3HAC075721-001 Revision: C
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.6.9 Replacing the axis-4 timing belt
Continued
Содержание IRB 920
Страница 1: ...ROBOTICS Product manual IRB 920 ...
Страница 2: ...Trace back information Workspace 22A version a22 Checked in 2022 03 21 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 50: ...This page is intentionally left blank ...
Страница 110: ...This page is intentionally left blank ...
Страница 984: ...This page is intentionally left blank ...
Страница 1000: ...This page is intentionally left blank ...
Страница 1002: ...This page is intentionally left blank ...
Страница 1006: ......
Страница 1007: ......