2 Installation and commissioning
2.8.1. Additional installation procedure
3HAC022033-001 Revision: E
122
©
Co
py
rig
h
t 200
4 - 20
08 ABB.
All r
ig
h
ts r
e
se
rv
ed
.
2.8 Making robot ready for operation (Foundry Prime)
2.8.1. Additional installation procedure
General
Robots delivered with the Foundry Prime protection are specially designed to work in water
jet cleaning cells with 100% humidity and alkaline detergent. To ensure that the protection
offers the best reliability, some measures are needed during installation of the robot according
to the procedures below.
NOTE!
For best reliability, it is of highest importance that the special maintenance instructions for
the Foundry Prime robot are followed and documented.
Commissioning
•
Never switch off the overpressure in motors and serial measurement compartment
during cooling down of robot after it has been switched off.
•
When turning off a cleaning cell we recommend that the humid air inside a cell is
ventilated out, to avoid that the humid air is sucked into gearboxes for example, due
to the raised vacuum when cooled down.
Environmental conditions
The table below details the environmental conditions.
Air specification for pressurizing of robot
The air must be dry and clean, such as instrument air. The table below details the air
specifications.
Parameter
Value
Humidity
100%
Washing detergent with pH
<9.0
Washing detergent must contain rust inhibitor
and be approved by ABB
Cleaning bath temperature
<60°C, used in a typical waterjet cleaning
application at suitable speed.
Parameter
Value
Dew point
<+2°C at 6 bar
Solid particle size
<5 microns
Oil content
<1 ppm (1 mg/m3)
Pressure to robot
0.2 - 0.3 bar
Continues on next page
Содержание IRB 7600 - 150/3.5
Страница 2: ......
Страница 461: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Contents 101 ...
Страница 463: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Legend 103 ...
Страница 464: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Brake Release Unit 104 ...
Страница 466: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Axis 1 106 ...
Страница 467: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Axis 2 107 ...
Страница 468: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Axis 3 108 ...
Страница 469: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Axis 4 109 ...
Страница 470: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Axis 5 IRB 7600 110 ...
Страница 471: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Axis 6 111 ...
Страница 472: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Switches axis 1 113 ...
Страница 473: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Switches Fan axis 2 114 ...
Страница 474: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Switches Fan axis 3 115 ...
Страница 475: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Axis 5 IRB 6600 901 ...
Страница 476: ... Copyright 2004 2006 ABB All rights reserved Revision 02 sheet Circuit Diagram 3HAC 13347 1 Design changes note 1 1 905 ...
Страница 481: ......