Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30
8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring
at turbine end
© Copyright 2020 . All rights reserved.
HZTL2481_EN
Rev.D
March 2020
Segment connection assembly
u
Carefully clean slots and contact surfaces of the casings and keep
them free of metal chips.
u
Keep slots and spiral-wound gasket free of oil and grease.
In the case of the gas inlet casing with segments, the segments are posi-
tioned with the aid of recesses and cams on the casing.
u
Coat the screw threads with high-temperature grease.
1) If present
u
Fix a
new
spiral-wound gasket (61050) in the slot using a little super-
glue (for example "Loctite® 454 gel") applied at three evenly distrib-
uted points.
u
Position gas inlet casing complete with nozzle ring on gas outlet cas-
ing (61001).
u
Remove the two studs (90177) in the lower area.
u
Attach the segment (51012) with the recess on the cam on the gas in-
let casing and fit it loosely using screws (61044).
u
Put remaining segments (51012) in place on gas inlet casing (51001)
and fit them loosely using screws (61044).
Check
u
Collar (C) of segments (51012) must be in slot (S).
Page
110
/
134