Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30
8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring
at turbine end
© Copyright 2020 . All rights reserved.
HZTL2481_EN
Rev.D
March 2020
Flange connection assembly
u
Carefully clean slots and contact surfaces of the casings and keep
them free of metal chips.
u
Keep slots and spiral-wound gasket free of oil and grease.
1) If present
u
Fix a
new
spiral-wound gasket (61050) in the slot using a little super-
glue (for example "Loctite® 454 gel") applied at three evenly distrib-
uted points.
TPL73 – TPL77
u
Fit the nozzle ring. Place the holder (90175) over the nozzle ring, then
tighten holder (90175) using screw (61044) and Verbus Ripp® washer
(61043).
u
Align gas inlet casing and secure using hexagon nuts (90178) on studs
(90177).
TPL69
u
Insert and position nozzle ring.
TPL73 – TPL77
u
Remove holder (90175) and screw (61044) together with Verbus Ripp®
washers (61043).
u
Coat thread of screws (61044) with high-temperature grease.
u
Fit the gas inlet casing flange hand-tight to the gas outlet casing us-
ing screws (61044) and Verbus Ripp® washers (61043).
u
Remove the hexagon nuts (90178) from the studs (90177).
u
Replace the studs (90177) with hexagon-head screws (61044) and Ver-
bus Ripp® washers (61043).
Page
109
/
134