18
1
2
2
3
3
3
3
228
228
228
150
277
141
A
A
118
228
228
228
159
141
B
B
A-A
B-B
5.8. How to connect earthing switch EF 230
Comply with the following instructions when installing the earthing
switch.
1. Assemble the fuse holder base on the right-hand side of the panel.
There are two positions, depending on the length of the fuse
chosen.
Fig. 16
Pos.
Description
A0001
Q.ty
A0002
Q.ty
1
Fuse base
1
1
2
Screw ISO8678_M8X20-8.8/ZNBLC6
8
8
3
M8-Steel 6 flanged hex nut
8
8
A0002 Assembly in the lower position
for ABB 442-length fuses
A0001 Assembly in the upper position
for ABB 292-length fuses
Содержание GSec/IB
Страница 43: ...43 ...