Installation
APPLY POWER TO THE FBVi-2U4-4T
For the initial configuration of the device, the controller must first be powered on.
Note
:
Service Port
(USB connection) must not be connected until after the device is powered on.
The
FBVi-2U4-4T
requires 24 V AC/DC supplied from an externally mounted power transformer. One
conductor of the transformer must be grounded to an earth ground to avoid damage to the controller.
This conductor will be wired to the
COM
(common) terminal of the controller. The wiring diagram is shown
here:
Note:
Ensure the 24 V AC/DC and
Common
wires are correctly connected to the controller. If the wires are
swapped, it may cause damage to anything connected to the controller.
CONNECT THE FBVi TO AN IP NETWORK
Place an Ethernet
cable from the Network’s Ethernet switch into one of the 2 Ethernet ports on the top of
the
FBVi
:
IP Cabling requirements
Cable
Standard patch cable, Cat 5e with 4 pairs of wires fitted with RJ-45
connectors
RJ-45 pin connections
Straight-through wiring
Characteristic impedance
100-130 Ohms
Distributed capacitance
Less than 100 pF per meter (30 pF per foot)
Maximum Cable length
between IP devices
328 ft. (100 m) maximum