
GUID-28FD832E-DE8C-49B4-8065-39491F80EBAD V1 EN
Figure 16:
Updating data flow
After the update, the GOOSE inputs are shown in
Project Navigator
submenu under
LD0/LLN0/Inputs
in the receiving IED.
GUID-B20F09F5-0917-4990-8AF3-002B2D875B8C V1 EN
Figure 17:
GOOSE inputs show under the Inputs submenu.
5.
Repeat the drag-and-drop operation for every IED receiving data from the
selected GOOSE control block.
Deleting a GOOSE input
1.
Select the IED in the
Client IED
box.
2.
Press
Delete
and confirm the deletion by clicking
Yes
.
1MRS757255 B
Section 5
GOOSE
Breaker Integrated Protection RBX615
31
Engineering Guide