Page 23
© 2021 ABB. All rights reserved.
6. Installing the Shelf Level Upstream Product
Unpacking Shelf Level Upstream Product
Make sure the framework has the space and the airflow to provide an acceptable operating envi-
ronment for the CPS3200U shelf. Then unpack the equipment.
Step
Action
4.
Save the shipping package until all parts are operating within specifications. If the equipment must be re-
turned, it should be repacked in the original shipping crate.
Installing and Powering the CP3200U Converter Shelf
Position the Shelf and mechanically attach it to the frame
Step
Action
Locate the 2 mounting brackets, one on each side of the CPS3200U shelf; align the holes in the shelf mounting
bracket with the holes in the mounting frame. Attach the brackets to the frame using two screws per frame as
shown.
Figure 4 Mounting the Converter Shelf
Содержание CPS3200U
Страница 1: ...Page 1 2021 ABB All rights reserved PRODUCT MANUAL ...
Страница 12: ...Page 12 2021 ABB All rights reserved This page intentionally left blank ...
Страница 17: ...Page 17 2021 ABB All rights reserved Figure 2 Capacitance Safety Limits ...
Страница 20: ...Page 20 2021 ABB All rights reserved This page intentionally left blank ...
Страница 22: ...Page 22 2021 ABB All rights reserved This page intentionally left blank ...
Страница 33: ...Page 33 2021 ABB All rights reserved Step Action 2 ...
Страница 34: ...Page 34 2021 ABB All rights reserved Step Action Slide the filter in to the filter bracket 4 ...
Страница 43: ...Page 43 2021 ABB All rights reserved Step Action 14 ...
Страница 48: ...Page 48 2021 ABB All rights reserved ...
Страница 51: ...Page 51 2021 ABB All rights reserved 10 Maintenance ...
Страница 52: ...Page 52 2021 ABB All rights reserved This page intentionally left blank ...
Страница 62: ...Page 62 2021 ABB All rights reserved This page intentionally left blank ...