four_step_example.png
Figure 4.9.5-2 A completed four step sequence SFC
Adding a sequence POU to PLC MainTask
configuration
4.10.
After a successful build, add the sequence POU to PLC MainTask configuration.
To add the sequence POU to PLC MainTask configuration:
1.
Double-click MainTask in the Devices view. In the MainTask editor, click Add
Call, see Figure 4.10-1.
36
1MRS755001
COM600 series 5.1
Sequence Control Configuration Manual
Содержание COM600 series
Страница 1: ...COM600 series 5 1 Sequence Control Configuration Manual...
Страница 2: ......
Страница 65: ......