Type CKO Overcurrent Relay

41-101.3A

15

time dial position or 4 tap setting, 0.6 seconds at 6

times tap value current).

To provide selective circuit breaker operation, a min-

imum coordinating time of 0.3 seconds plus circuit

breaker time is recommended between the relay be-

ing set and the relays with which coordination is to be

effected.

The connector screws on the tap plate above the

time dial makes connections to various turns on the

operating coil. By placing this screw in the various

tap plate holes, the relay will just close its contacts at

the corresponding current 4, 5, 6, 7, 8, 10, 12 am-

peres, or as marked on the tap plates.

CAUTION

!

Since the tap block screw carries operating cur-
rent, be sure that the screws are turned tight.

In order to avoid opening current transformer
circuits when changing taps under load, the re-
lay must first be removed from the case.
 Chassis
operating shorting switches on the case will short the
secondary of the current transformer. The taps
should then be changed with the relay outside of the
case and then reinserted into the case.

4.2

Instantaneous Reclosing

The factory adjustment of the CO unit contacts pro-

vides a contact follow. Where circuit breaker reclos-

ing will be initiated immediately after a trip by the CO

contact, the time of the opening of the contacts

should be a minimum. This condition is obtained by

loosening the stationary contact mounting screw, re-

moving the contact plate and then replacing the plate

with the bent end resting against the contact spring.

With this change and the contact mounting screw

tightened, the stationary contact will rest solidly

against its backstop.

Figure 9.    Maximum Pickup and Dropout Time Curves for  Instantaneous Overcurrent Unit.

629A576

*Sub 4

Содержание CKO-5

Страница 1: ......

Страница 2: ...ge is used for mount ing the adjustable stationary contact housing The stationary contact housing is held in position by a spring type clamp The spring adjuster is located on the underside of the bridge and is attached to the moving contact arm by a spiral spring The spring ad juster is also held in place by a spring type clamp With the contact closed the electrical connection is made through the ...

Страница 3: ...aps refer to the section under ad justments The pickup and dropout time curves for the instantaneous overcurrent units is shown in Fig ure 9 TIME OVERCURRENT UNIT Range Taps 5 2 5 0 5 0 6 0 8 1 0 1 5 2 0 2 5 2 6 2 2 5 3 3 5 4 5 6 4 12 4 5 6 7 8 1 0 1 2 The tap value is the minimum current required to just close the relay contacts This time vs current characteristics for the time overcurrent unit a...

Страница 4: ... 51 2 4 51 6 1 7 45 1 2 45 4 16 8 1 8 40 0 7 40 9 1 9 38 0 6 38 1 2 2 2 34 0 37 34 1 6 2 5 30 0 24 31 1 0 1 7 28 0 43 28 1 5 2 4 21 0 27 21 2 0 3 1 16 0 20 17 10 40 2 4 3 6 15 0 15 15 3 0 4 2 12 0 11 13 4 0 4 9 11 0 08 12 2 0 6 6 31 0 40 31 3 0 9 3 24 0 25 24 20 80 4 0 12 0 20 0 18 20 4 8 13 5 18 0 14 18 6 0 15 9 16 0 10 16 8 0 19 2 15 0 07 15 CONTINUOUS RATING ONE SECOND RATING RANGE AMPERES AMPE...

Страница 5: ... 2850 2 0 3 1 110 59 5 04 38 7 262 800 2 5 4 0 110 55 5 13 39 8 280 920 3 0 4 4 110 51 5 37 40 8 312 1008 2 6 3 5 4 8 110 47 5 53 42 8 329 1120 4 0 5 2 110 45 5 72 46 0 360 1216 5 0 5 6 110 41 5 90 50 3 420 1500 6 0 6 0 110 37 6 54 54 9 474 1800 4 0 7 3 230 65 4 92 39 1 268 848 5 0 8 0 230 50 5 20 42 0 305 1020 6 0 8 8 230 47 5 34 44 1 330 1128 4 12 7 0 9 6 230 46 5 53 45 8 364 1260 8 0 10 4 230 4...

Страница 6: ...13 7 230 57 4 38 26 5 183 624 4 16 0 460 65 4 00 22 4 126 376 5 18 8 460 63 4 15 23 7 143 450 6 19 3 460 61 4 32 25 3 162 531 4 12 7 20 8 460 59 4 35 26 4 183 611 8 22 5 460 56 4 40 27 8 204 699 1 0 25 0 460 53 4 60 30 1 247 880 1 2 28 0 460 47 4 92 35 6 288 1056 CKO 7 TIME OVERCURRENT UNITS VOLT AMPERES CONTINUOUS ONE SECOND POWER AT AT 3 TIMES AT 10 TIMES AT 20 TIMES AMPERE RATING RATING FACTOR ...

Страница 7: ...VERCURRENT UNITS VOLT AMPERES CONTINUOUS ONE SECOND POWER AT AT 3 TIMES AT 10 TIMES AT 20 TIMES AMPERE RATING RATING FACTOR TAP VALUE TAP VALUE TAP VALUE TAP VALUE RANGE TAP AMPERES AMPERES ANGLE ø CURRENT CURRENT CURRENT CURRENT 0 5 1 7 56 36 0 72 6 54 71 8 250 0 6 1 9 56 34 0 75 6 80 75 0 267 0 8 2 2 56 30 0 81 7 46 84 0 298 0 5 2 5 1 0 2 5 56 27 0 89 8 30 93 1 330 1 5 3 0 56 22 1 13 10 04 115 5...

Страница 8: ...41 101 3A Type CKO Overcurrent Relay 8 Figure 2 Typical Time Curves of the Time Overcurrent Unit of the Short Time 2 Relays 418244 Sub 3 ...

Страница 9: ...Type CKO Overcurrent Relay 41 101 3A 9 Figure 3 Typical Time Curves of the Time Overcurrent Unit of the Long Time 5 Relays 418245 Sub 2 ...

Страница 10: ...41 101 3A Type CKO Overcurrent Relay 10 Figure 4 Typical Time Curves of the Time Overcurrent Unit of the Definite Time 6 Relays 418246 Sub 3 ...

Страница 11: ...Type CKO Overcurrent Relay 41 101 3A 11 418247 Sub 3 Figure 5 Typical Time Curves of the Time Overcurrent Unit of the Moderately Inverse 7 Relays ...

Страница 12: ...41 101 3A Type CKO Overcurrent Relay 12 Figure 6 Typical Time Curves of the Time Overcurrent Unit of the Inverse 8 Relays 418248 Sub 2 ...

Страница 13: ...Type CKO Overcurrent Relay 41 101 3A 13 Figure 7 Typical Time Curves of the Time Overcurrent Unit of the Very Inverse 9 Relays 418249 Sub 2 ...

Страница 14: ...41 101 3A Type CKO Overcurrent Relay 14 Figure 8 Typical Time Curves of the Time Overcurrent Unit of the Extremely Inverse 11 Relays 288B655 Sub 2 ...

Страница 15: ...nt transformer circuits when changing taps under load the re lay must first be removed from the case Chassis operating shorting switches on the case will short the secondary of the current transformer The taps should then be changed with the relay outside of the case and then reinserted into the case 4 2 Instantaneous Reclosing The factory adjustment of the CO unit contacts pro vides a contact fol...

Страница 16: ...as required for poorly grounded or insulating panels Other electrical con nections may be made directly to the terminal by means of screws for steel panel mounting or to the terminal stud furnished with the relay for thick panel mounting The terminal stud may be easily removed or inserted by locking two nuts on the stud and then turning the proper nut with a wrench For detail information on the FT...

Страница 17: ... material for cleaning contacts is not recommended because of the danger of embedding small particles in the face of the soft silver and thus impairing the contact 6 3 CALIBRATION Use the following procedure for calibrating the relay if the relay has been taken apart for repairs or the ad justments have been disturbed This procedure should not be used unless it is apparent that the re lay is not i...

Страница 18: ...41 101 3A Type CKO Overcurrent Relay 18 Figure 10 Diagram of Test Connections of the Time Overcurrent Unit 1455C31 Sub 1 ...

Страница 19: ...Type CKO Overcurrent Relay 41 101 3A 19 Figure 11 External Schematic of the CKO Relay 1452C84 Sub 2 ...

Страница 20: ...easure the operating time Adjust the permanent magnet keeper until the operating time corresponds to the value of Table 1 Apply the indicated current per Table 1 for the elec tromagnet plug adjustment e g CKO 8 20 times tap value and measure the operating time Adjust the proper plug until the operating time corresponds to the value in Table 1 Withdrawing the left hand plug front view increases the...

Страница 21: ...n indicator target should drop freely bringing the letter T into view b Close contacts of instantaneous overcurrent unit I Pass sufficient dc current through the trip cir cuit to close contacts of the ICS I This value of current should not be greater than the particular ICS I tap setting being used The operation indi cator target should drop freely bringing the letter I into view 8 0 RENEWAL PARTS...

Страница 22: ......

Страница 23: ...Type CKO Overcurrent Relay 41 101 3A 23 THIS SPACE RESERVED FOR NOTES ...

Страница 24: ...ABB Inc 4300 Coral Ridge Drive Coral Springs Florida 33065 Telephone 1 954 752 6700 Fax 1 954 345 5329 www abb com substation automation IL 41 101 3 Revision A ABB ...

Отзывы: