INSTALLATION
MAKING CO NNECTIO NS AND PO WER ING U P
4JNO0 0030 8 A
27
6.
Continue attaching any other module(s) to the mounting rail as described in Step 1.
ABB recommends the use of end clamps to prevent modules from sliding left
and right on the mounting rail.
7.
When all modules are installed, place an end clamp tight up against the left side of
the left-most module on the mounting rail. Then place a second end clamp tight up
against the right side of the right-most module on the mounting rail.
8.
Connect AWIN GW120's earth connection to an earth ground.
Connect the DIN rail to protective earth ground using a grounding terminal block. To re-
move AWIN GW120 follow the procedure shown in
Figure 6: Removing AWIN GW120 from the DIN rail
5.2
Making connections and powering up
5.2.1
Power connections
Installation notes:
–
Installation, operation and maintenance may be carried out only by qualified
electricians. Follow the specified installation instructions. The applicable
specifications and safety directives (including the national safety directives),
as well as the general technical regulations must be observed during installa-
tion and operation. The technical data should be taken from the packaging
instructions and the certificates (conformity assessment, other possible ap-
provals).
–
Opening the device or making changes to it is not permitted. Do not repair
the device yourself but, replace it with an equivalent device. Repairs may be
carried out only by the manufacturer. The manufacturer is not liable for any
damage due to violation of the prescribed regulations.
Содержание AWIN GW120
Страница 1: ... ENERGY INDUSTRIES ABB Wireless Industrial Network AWIN GW120 User Manual ...
Страница 2: ......
Страница 3: ... ENERGY INDUSTRIES ABB Wireless Industrial Network AWIN GW120 User Manual ...
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 74: ......
Страница 75: ......
Страница 76: ... Visit us abb com awin Document Number 4JNO000308 Rev A ...