The higher the concentration of heat transfer fluid, the higher the viscosity of the coolant.
This results in a higher pressure loss in the system. See
.
The nominal current ratings of drive system modules apply to an Antifrogen® L / water
solution of 25/75% (volume). With the Antifrogen® L concentration between 25% and 50%,
the drive output current must be derated by 1/3 percentage point per 1 p.p. increase in
Antifrogen® L concentration. The drawing below shows the derating factor
(k)
in relation to
Antifrogen® L concentration.
1.00
0.95
25%
k
0.90
30%
35%
40%
45%
50%
Antifrogen® L concentration
Incoming coolant temperature:
•
0…40 °C (32…104 °F): no drive output current derating required
•
40…45 °C (104…113 °F): drive output current must be derated by 2 percentage points
per 1 °C (1.8 °F) temperature increase, as shown by curve (a).
•
45…50 °C (113…122 °F):
•
If components with a maximum operating temperature of 55 °C (131 °F) are installed
in the same space as the drive modules, drive output current must be derated by
6 percentage points per 1 °C (1.8 °F) temperature increase, as shown by curve (c).
•
If there are no components with a maximum operating temperature of 55 °C (131 °F)
installed in the same space as the drive modules, drive output current must be
derated by 2 percentage points per 1 °C (1.8 °F) temperature increase, as shown
by curve (b).
The drawing below shows the derating factor
(k)
in relation to coolant temperature.
Internal cooling circuit 131
The drawing below shows the derating factor (
k
) in relation to coolant temperature.
Condensation is not allowed. The minimum coolant temperature to avoid condensation (at
an atmospheric pressure of 1 bar) is shown below as a function of relative humidity (f) and
ambient temperature (
T
air
).
Maximum temperature rise:
Depends on heat losses and mass flow. Typically 5 °C
(9 °F) with nominal losses and flow.
Pressure limits
Base pressure:
100 … 150 kPa (recommended); 200 kPa (maximum). “Base pressure”
denotes the pressure of the system compared with the atmospheric pressure when the
cooling circuit is filled with coolant.
Air counterpressure in the expansion tank:
40 kPa
Design pressure:
600 kPa
Nominal pressure difference
(between main in/out lines)
:
120 kPa
Maximum pressure difference
(between main in/out lines)
:
200 kPa
T
air
(°C)
Min. T
coolant
(°C)
I
= 95%
I
= 80%
I
= 65%
I
= 50%
I
= 40%
5
4.3
1.9
-0.9
-4.5
-7.4
10
9.2
6.7
3.7
-0.1
-3.0
15
14.2
11.5
8.4
4.6
1.5
20
19.2
16.5
13.2
9.4
6.0
25
24.1
21.4
17.9
13.8
10.5
30
29.1
26.2
22.7
18.4
15.0
35
34.1
31.1
27.4
23.0
19.4
40
39.0
35.9
32.2
27.6
23.8
45
44.0
40.8
36.8
32.1
28.2
50
49.0
45.6
41.6
36.7
32.8
55
53.9
50.4
46.3
42.2
37.1
= Not allowed as standard but the coolant temperature must be 4 °C (39 °F) or above.
Consult an ABB representative if operation below coolant temperature 4 °C is required.
Example:
At an air temperature of 45 °C and relative humidity of 65% the coolant temperature may
not be below +36.8 °C
T
1.00
0.90
+40 °C
+104 °F
k
0.80
0.70
0.60
+45 °C
+113 °F
+50 °C
+122 °F
(a)
(b)
(c)
ACS880LC_coolant temp derating curve.pdf
Condensation is not allowed. The minimum coolant temperature to avoid condensation (at
an atmospheric pressure of 1 bar) is shown below as a function of relative humidity (RH)
and ambient temperature (
T
air
).
Min. T
coolant
(°C)
T
air
(°C)
RH = 40%
RH = 50%
RH = 65%
RH = 80%
RH = 95%
-7.4
-4.5
-0.9
1.9
4.3
5
Internal cooling circuit 177
Содержание ACS880-204LC
Страница 1: ... ABB INDUSTRIAL DRIVES ACS880 204LC IGBT supply modules Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 16: ...16 ...
Страница 32: ...32 ...
Страница 39: ...Overview of kits Cabinet construction 39 ...
Страница 40: ...Stage 1 Installation of common parts 40 Cabinet construction ...
Страница 41: ...Stage 2 Installation of LCL side plates and common AC bus Cabinet construction 41 ...
Страница 42: ...Stage 3 Installation of brackets for Flat PLS holder 42 Cabinet construction ...
Страница 43: ...Stage 4A BLCL 15LC 7 AC connection and fuse busbars installation Cabinet construction 43 ...
Страница 44: ...Stage 4B BLCL 24LC 7 AC connection and fuse busbars installation 44 Cabinet construction ...
Страница 45: ...Stage 5 Installation of LCL choke mounting mechanics and LCL ISU connection Cabinet construction 45 ...
Страница 46: ...Stage 6 LCL choke and LCL choke busbar installation 46 Cabinet construction ...
Страница 47: ...Stage 7 Heat exchanger heat exchanger mechanics and cooling components installation Cabinet construction 47 ...
Страница 48: ...Stage 8A BLCL 15LC 7 LCL capacitor support fan support mechanics and fan installation 48 Cabinet construction ...
Страница 49: ...Stage 8B BLCL 24LC 7 LCL capacitor support fan support mechanics and fan installation Cabinet construction 49 ...
Страница 50: ...Stage 9 Installation of LCL shroud kit 50 Cabinet construction ...
Страница 52: ...Overview of kits 52 Cabinet construction ...
Страница 53: ...Stage 1 Installation of common parts Cabinet construction 53 ...
Страница 54: ...Stage 2 Installation of LCL side plates and common AC bus 54 Cabinet construction ...
Страница 55: ...Stage 3 Installation of brackets for Flat PLS holder Cabinet construction 55 ...
Страница 56: ...Stage 4 AC connection and fuse busbars installation 56 Cabinet construction ...
Страница 57: ...Stage 5 Installation of LCL choke mounting mechanics and LCL ISU connection Cabinet construction 57 ...
Страница 58: ...Stage 6 LCL choke and LCL choke busbar installation 58 Cabinet construction ...
Страница 59: ...Stage 7 Heat exchanger heat exchanger mechanics and cooling components installation Cabinet construction 59 ...
Страница 60: ...Stage 8 LCL capacitor support fan support mechanics and fan installation 60 Cabinet construction ...
Страница 61: ...Stage 9 Installation of LCL shroud kit Cabinet construction 61 ...
Страница 65: ...Overview of kits Cabinet construction 65 ...
Страница 66: ...Stage 1 Installation of common parts 66 Cabinet construction ...
Страница 67: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 67 ...
Страница 68: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 68 Cabinet construction ...
Страница 69: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 69 ...
Страница 70: ...Stage 5A Installation of DC busbars 70 Cabinet construction ...
Страница 71: ...Stage 5B Installation of DC switch DC connection and common mode filter busbar kits Cabinet construction 71 ...
Страница 72: ...Stage 6 Module installation 72 Cabinet construction ...
Страница 73: ...Stage 7 Installation of shrouding Cabinet construction 73 ...
Страница 77: ...Overview of kits Cabinet construction 77 ...
Страница 78: ...Stage 1 Installation of common parts 78 Cabinet construction ...
Страница 79: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 79 ...
Страница 80: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 80 Cabinet construction ...
Страница 81: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 81 ...
Страница 82: ...Stage 5A Installation of DC busbars 82 Cabinet construction ...
Страница 83: ...Stage 5B Installation of DC switch DC connection and common mode filter busbar kits Cabinet construction 83 ...
Страница 84: ...Stage 6 Module installation 84 Cabinet construction ...
Страница 85: ...Stage 7 Installation of shrouding Cabinet construction 85 ...
Страница 89: ...Overview of kits Cabinet construction 89 ...
Страница 90: ...Stage 1 Installation of common parts 90 Cabinet construction ...
Страница 91: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 91 ...
Страница 92: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 92 Cabinet construction ...
Страница 93: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 93 ...
Страница 94: ...Stage 5A Installation of DC busbars 94 Cabinet construction ...
Страница 95: ...Stage 5B Installation of DC switch DC connection and common mode filter busbar kits Cabinet construction 95 ...
Страница 96: ...Stage 6 Module installation 96 Cabinet construction ...
Страница 97: ...Stage 7 Installation of shrouding Cabinet construction 97 ...
Страница 98: ...98 ...
Страница 114: ...114 ...
Страница 125: ...a b c Maintenance 125 ...
Страница 180: ...180 ...
Страница 206: ...206 ...
Страница 208: ...Frame R8i module 208 Dimension drawings ...
Страница 209: ... Quick connector Dimension drawings 209 ...
Страница 210: ...LCL filter components Grid side choke BLCL 15LC 7 and BLCL 24LC 7 210 Dimension drawings ...
Страница 211: ... Grid side choke BLCL 25LC 7 Dimension drawings 211 ...
Страница 212: ... Converter side choke BLCL 15LC 7 and BLCL 24LC 7 212 Dimension drawings ...
Страница 213: ... Converter side choke BLCL 25LC 7 Dimension drawings 213 ...
Страница 214: ... Capacitor www tdk electronics tdk com 214 Dimension drawings ...
Страница 276: ...276 ...