Start-up procedure
Tasks
Safety
WARNING!
Obey the safety instructions during the start-up procedure. See
Safety instructions for ACS880
liquid-cooled multidrive cabinets and modules
(3AXD50000048633 [English]). Only qualified
electricians are allowed to start-up the drive.
Checks/Settings with no voltage connected
WARNING!
Ensure that the disconnector of the supply transformer is locked to the off (0) position, that
means no voltage is, or can not be, connected to drive inadvertently.
The no-load current of the IGBT supply unit must be taken into account if pretests (eg, factory tests)
are made on the IGBT supply unit by using a temporary main AC supply. The no-load current circulates
between the supply network and the LCL filter capacitors and therefore stresses the supply transformer.
To avoid supply transformer overload, the supply transformer must be dimensioned according to 15%
of IGBT supply unit nominal current. The transformer should be dedicated for the IGBT supply unit
only, no other (sensitive) load shall be connected in same transformer secondary to avoid disturbance
and malfunction.
In case a generator is used as a supply, it should be dimensioned according to the nominal current of
the IGBT supply unit.
Supply transformer
IGBT supply module
LCL filter
I(noload)
Check that the main disconnecting device (main switch-disconnector or main circuit breaker) [Q1] is
switched off.
Check the mechanical and electrical installation. See chapter
.
Check the settings of breakers/switches in the auxiliary circuits.
Drives with a charging switch [Q3] and a DC switch-disconnector for line-up charging [Q40]: Open the
charging circuit switch [Q3] and the DC switch-disconnector for line-up charging [Q40].
If time relays, or relays with delayed make contact or break contact are used in emergency stop circuits,
check the relay time settings. See delivery-specific circuit diagrams and safety function specific docu-
mentation (if applicable).
Disconnect the unfinished or unchecked 230 V AC cables that lead from the terminal blocks to the
outside of the equipment.
Check that both circuits of STO terminals on the supply control unit are closed (IN1 and IN2 must be
connected to OUT). The supply unit cannot start is either circuit is open. Refer to the wiring diagrams
delivered with the drive and chapter .
Check that both channels of STO IN (X52) connector on IGBT supply module are connected to 24 V DC
for the supply unit to start.
118 Start-up
Содержание ACS880-204LC
Страница 1: ... ABB INDUSTRIAL DRIVES ACS880 204LC IGBT supply modules Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 16: ...16 ...
Страница 32: ...32 ...
Страница 39: ...Overview of kits Cabinet construction 39 ...
Страница 40: ...Stage 1 Installation of common parts 40 Cabinet construction ...
Страница 41: ...Stage 2 Installation of LCL side plates and common AC bus Cabinet construction 41 ...
Страница 42: ...Stage 3 Installation of brackets for Flat PLS holder 42 Cabinet construction ...
Страница 43: ...Stage 4A BLCL 15LC 7 AC connection and fuse busbars installation Cabinet construction 43 ...
Страница 44: ...Stage 4B BLCL 24LC 7 AC connection and fuse busbars installation 44 Cabinet construction ...
Страница 45: ...Stage 5 Installation of LCL choke mounting mechanics and LCL ISU connection Cabinet construction 45 ...
Страница 46: ...Stage 6 LCL choke and LCL choke busbar installation 46 Cabinet construction ...
Страница 47: ...Stage 7 Heat exchanger heat exchanger mechanics and cooling components installation Cabinet construction 47 ...
Страница 48: ...Stage 8A BLCL 15LC 7 LCL capacitor support fan support mechanics and fan installation 48 Cabinet construction ...
Страница 49: ...Stage 8B BLCL 24LC 7 LCL capacitor support fan support mechanics and fan installation Cabinet construction 49 ...
Страница 50: ...Stage 9 Installation of LCL shroud kit 50 Cabinet construction ...
Страница 52: ...Overview of kits 52 Cabinet construction ...
Страница 53: ...Stage 1 Installation of common parts Cabinet construction 53 ...
Страница 54: ...Stage 2 Installation of LCL side plates and common AC bus 54 Cabinet construction ...
Страница 55: ...Stage 3 Installation of brackets for Flat PLS holder Cabinet construction 55 ...
Страница 56: ...Stage 4 AC connection and fuse busbars installation 56 Cabinet construction ...
Страница 57: ...Stage 5 Installation of LCL choke mounting mechanics and LCL ISU connection Cabinet construction 57 ...
Страница 58: ...Stage 6 LCL choke and LCL choke busbar installation 58 Cabinet construction ...
Страница 59: ...Stage 7 Heat exchanger heat exchanger mechanics and cooling components installation Cabinet construction 59 ...
Страница 60: ...Stage 8 LCL capacitor support fan support mechanics and fan installation 60 Cabinet construction ...
Страница 61: ...Stage 9 Installation of LCL shroud kit Cabinet construction 61 ...
Страница 65: ...Overview of kits Cabinet construction 65 ...
Страница 66: ...Stage 1 Installation of common parts 66 Cabinet construction ...
Страница 67: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 67 ...
Страница 68: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 68 Cabinet construction ...
Страница 69: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 69 ...
Страница 70: ...Stage 5A Installation of DC busbars 70 Cabinet construction ...
Страница 71: ...Stage 5B Installation of DC switch DC connection and common mode filter busbar kits Cabinet construction 71 ...
Страница 72: ...Stage 6 Module installation 72 Cabinet construction ...
Страница 73: ...Stage 7 Installation of shrouding Cabinet construction 73 ...
Страница 77: ...Overview of kits Cabinet construction 77 ...
Страница 78: ...Stage 1 Installation of common parts 78 Cabinet construction ...
Страница 79: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 79 ...
Страница 80: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 80 Cabinet construction ...
Страница 81: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 81 ...
Страница 82: ...Stage 5A Installation of DC busbars 82 Cabinet construction ...
Страница 83: ...Stage 5B Installation of DC switch DC connection and common mode filter busbar kits Cabinet construction 83 ...
Страница 84: ...Stage 6 Module installation 84 Cabinet construction ...
Страница 85: ...Stage 7 Installation of shrouding Cabinet construction 85 ...
Страница 89: ...Overview of kits Cabinet construction 89 ...
Страница 90: ...Stage 1 Installation of common parts 90 Cabinet construction ...
Страница 91: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 91 ...
Страница 92: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 92 Cabinet construction ...
Страница 93: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 93 ...
Страница 94: ...Stage 5A Installation of DC busbars 94 Cabinet construction ...
Страница 95: ...Stage 5B Installation of DC switch DC connection and common mode filter busbar kits Cabinet construction 95 ...
Страница 96: ...Stage 6 Module installation 96 Cabinet construction ...
Страница 97: ...Stage 7 Installation of shrouding Cabinet construction 97 ...
Страница 98: ...98 ...
Страница 114: ...114 ...
Страница 125: ...a b c Maintenance 125 ...
Страница 180: ...180 ...
Страница 206: ...206 ...
Страница 208: ...Frame R8i module 208 Dimension drawings ...
Страница 209: ... Quick connector Dimension drawings 209 ...
Страница 210: ...LCL filter components Grid side choke BLCL 15LC 7 and BLCL 24LC 7 210 Dimension drawings ...
Страница 211: ... Grid side choke BLCL 25LC 7 Dimension drawings 211 ...
Страница 212: ... Converter side choke BLCL 15LC 7 and BLCL 24LC 7 212 Dimension drawings ...
Страница 213: ... Converter side choke BLCL 25LC 7 Dimension drawings 213 ...
Страница 214: ... Capacitor www tdk electronics tdk com 214 Dimension drawings ...
Страница 276: ...276 ...