Make sure that …
The main circuit connections inside the drive cabinet correspond to the circuit diagrams.
The control unit has been connected. See the circuit diagrams.
Appropriate AC fuses and main disconnector have been installed.
There is an adequately sized protective earth (ground) conductor between the drive and the switchboard,
the conductor has been connected to appropriate terminal, and the terminal has been tightened to the
proper torque. Proper grounding has also been measured according to the regulations.
The input power cable has been connected to the appropriate terminals, the phase order is right, and
the terminals have been tightened to the proper torque.
There is an adequately sized protective earth (ground) conductor between the motor and the drive,
and the conductor has been connected to appropriate terminal, and the terminal has been tightened
to the proper torque. (Pull on the conductors to check.). Proper grounding has also been measured
according to the regulations.
The motor cable has been connected to the appropriate terminals, the phase order is right, and the
terminals have been tightened to the proper torque.
The motor cable has been routed away from other cables.
No power factor compensation capacitors have been connected to the motor cable.
The control cables have been connected to the appropriate terminals, and the terminals have been
tightened to the proper torque.
If a drive bypass connection will be used: The direct-on-line contactor of the motor and the drive output
contactor are either mechanically and/or electrically interlocked, ie, cannot be closed simultaneously.
A thermal overload device must be used for protection when bypassing the drive. Refer to local codes
and regulations.
There are no tools, foreign objects or dust from drilling inside the drive.
Cover(s) of the motor connection box are in place. Cabinet shrouds are in place and doors are closed.
The motor and the driven equipment are ready for start.
The coolant connections between cubicles (if any) and to the cooling circuit are tight.
If the drive is equipped with a cooling unit: Refer to the cooling unit documentation for specific tasks.
116 Installation checklist of the drive
Содержание ACS880-204LC
Страница 1: ... ABB INDUSTRIAL DRIVES ACS880 204LC IGBT supply modules Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 16: ...16 ...
Страница 32: ...32 ...
Страница 39: ...Overview of kits Cabinet construction 39 ...
Страница 40: ...Stage 1 Installation of common parts 40 Cabinet construction ...
Страница 41: ...Stage 2 Installation of LCL side plates and common AC bus Cabinet construction 41 ...
Страница 42: ...Stage 3 Installation of brackets for Flat PLS holder 42 Cabinet construction ...
Страница 43: ...Stage 4A BLCL 15LC 7 AC connection and fuse busbars installation Cabinet construction 43 ...
Страница 44: ...Stage 4B BLCL 24LC 7 AC connection and fuse busbars installation 44 Cabinet construction ...
Страница 45: ...Stage 5 Installation of LCL choke mounting mechanics and LCL ISU connection Cabinet construction 45 ...
Страница 46: ...Stage 6 LCL choke and LCL choke busbar installation 46 Cabinet construction ...
Страница 47: ...Stage 7 Heat exchanger heat exchanger mechanics and cooling components installation Cabinet construction 47 ...
Страница 48: ...Stage 8A BLCL 15LC 7 LCL capacitor support fan support mechanics and fan installation 48 Cabinet construction ...
Страница 49: ...Stage 8B BLCL 24LC 7 LCL capacitor support fan support mechanics and fan installation Cabinet construction 49 ...
Страница 50: ...Stage 9 Installation of LCL shroud kit 50 Cabinet construction ...
Страница 52: ...Overview of kits 52 Cabinet construction ...
Страница 53: ...Stage 1 Installation of common parts Cabinet construction 53 ...
Страница 54: ...Stage 2 Installation of LCL side plates and common AC bus 54 Cabinet construction ...
Страница 55: ...Stage 3 Installation of brackets for Flat PLS holder Cabinet construction 55 ...
Страница 56: ...Stage 4 AC connection and fuse busbars installation 56 Cabinet construction ...
Страница 57: ...Stage 5 Installation of LCL choke mounting mechanics and LCL ISU connection Cabinet construction 57 ...
Страница 58: ...Stage 6 LCL choke and LCL choke busbar installation 58 Cabinet construction ...
Страница 59: ...Stage 7 Heat exchanger heat exchanger mechanics and cooling components installation Cabinet construction 59 ...
Страница 60: ...Stage 8 LCL capacitor support fan support mechanics and fan installation 60 Cabinet construction ...
Страница 61: ...Stage 9 Installation of LCL shroud kit Cabinet construction 61 ...
Страница 65: ...Overview of kits Cabinet construction 65 ...
Страница 66: ...Stage 1 Installation of common parts 66 Cabinet construction ...
Страница 67: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 67 ...
Страница 68: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 68 Cabinet construction ...
Страница 69: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 69 ...
Страница 70: ...Stage 5A Installation of DC busbars 70 Cabinet construction ...
Страница 71: ...Stage 5B Installation of DC switch DC connection and common mode filter busbar kits Cabinet construction 71 ...
Страница 72: ...Stage 6 Module installation 72 Cabinet construction ...
Страница 73: ...Stage 7 Installation of shrouding Cabinet construction 73 ...
Страница 77: ...Overview of kits Cabinet construction 77 ...
Страница 78: ...Stage 1 Installation of common parts 78 Cabinet construction ...
Страница 79: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 79 ...
Страница 80: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 80 Cabinet construction ...
Страница 81: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 81 ...
Страница 82: ...Stage 5A Installation of DC busbars 82 Cabinet construction ...
Страница 83: ...Stage 5B Installation of DC switch DC connection and common mode filter busbar kits Cabinet construction 83 ...
Страница 84: ...Stage 6 Module installation 84 Cabinet construction ...
Страница 85: ...Stage 7 Installation of shrouding Cabinet construction 85 ...
Страница 89: ...Overview of kits Cabinet construction 89 ...
Страница 90: ...Stage 1 Installation of common parts 90 Cabinet construction ...
Страница 91: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 91 ...
Страница 92: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 92 Cabinet construction ...
Страница 93: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 93 ...
Страница 94: ...Stage 5A Installation of DC busbars 94 Cabinet construction ...
Страница 95: ...Stage 5B Installation of DC switch DC connection and common mode filter busbar kits Cabinet construction 95 ...
Страница 96: ...Stage 6 Module installation 96 Cabinet construction ...
Страница 97: ...Stage 7 Installation of shrouding Cabinet construction 97 ...
Страница 98: ...98 ...
Страница 114: ...114 ...
Страница 125: ...a b c Maintenance 125 ...
Страница 180: ...180 ...
Страница 206: ...206 ...
Страница 208: ...Frame R8i module 208 Dimension drawings ...
Страница 209: ... Quick connector Dimension drawings 209 ...
Страница 210: ...LCL filter components Grid side choke BLCL 15LC 7 and BLCL 24LC 7 210 Dimension drawings ...
Страница 211: ... Grid side choke BLCL 25LC 7 Dimension drawings 211 ...
Страница 212: ... Converter side choke BLCL 15LC 7 and BLCL 24LC 7 212 Dimension drawings ...
Страница 213: ... Converter side choke BLCL 25LC 7 Dimension drawings 213 ...
Страница 214: ... Capacitor www tdk electronics tdk com 214 Dimension drawings ...
Страница 276: ...276 ...