![ABB ACS880-204LC Скачать руководство пользователя страница 138](http://html.mh-extra.com/html/abb/acs880-204lc/acs880-204lc_hardware-manual_2649138.webp)
■
Control electronics
Control unit
One BCU control unit is required per IGBT supply unit. The type of the control unit depends
on the number of IGBT supply modules as shown below. The control unit is delivered with
a memory unit containing the ACS880 IGBT supply control program.
Ordering code
Control unit type
Frame size
3AXD50000002937
BCU-02
R8i
3AXD50000015806
BCU-12
2×R8i…4×R8i
Note:
Fiber optic communication with another control unit (such as that of the inverter unit) requires
an RDCO-0x DDCS communication module. For more information, see
RDCO-0x DDCS
communication option modules user's manual
(3AFE64492209 [English]).
For more information on optional modules, see appropriate option module manual.
Fiber optic cables
Each frame R8i module is connected to the control unit with a pair of fiber optic cables.
The following kits, each consisting of a pair of plastic fiber optic cables, are available from
ABB:
Ordering code
Kit type designation
Length
58988821
NLWC-02
2 m
58948233
NLWC-03
3 m
58948250
NLWC-05
5 m
58948268
NLWC-07
7 m
58948276
NLWC-10
10 m
Auxiliary measurement unit (BAMU)
BAMU is a measurement unit for precise voltage and current measurements.
Ordering code
Unit type
Frame size
3AXD50000045879
BAMU-12C
All
For more information, see
BAMU-12C auxiliary measurement unit hardware manual
(3AXD50000117840 [English]).
Note:
You must have BCU-12 control unit to have enough fiber optic connections if you use
BAMU auxiliary measurement unit for 2×R8i IGBT supply modules.
Weak supply networks:
In weaker supply networks with a short-circuit ratio less than 8, it
is highly recommended to add an additional BAMU auxiliary measurement unit to the drive.
In such kind of networks, there is risk of unnecessary DC overvoltage tripping due to
disturbances caused by probable high voltage THD in the supply voltage. Short-circuit ratio
is defined as the supply network’s apparent short-circuit power
S
k,net
related to the drive’s
nominal apparent power
S
n
(
S
k,net
/
S
n
< 8 ).
138 Ordering information
Содержание ACS880-204LC
Страница 1: ... ABB INDUSTRIAL DRIVES ACS880 204LC IGBT supply modules Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 16: ...16 ...
Страница 32: ...32 ...
Страница 39: ...Overview of kits Cabinet construction 39 ...
Страница 40: ...Stage 1 Installation of common parts 40 Cabinet construction ...
Страница 41: ...Stage 2 Installation of LCL side plates and common AC bus Cabinet construction 41 ...
Страница 42: ...Stage 3 Installation of brackets for Flat PLS holder 42 Cabinet construction ...
Страница 43: ...Stage 4A BLCL 15LC 7 AC connection and fuse busbars installation Cabinet construction 43 ...
Страница 44: ...Stage 4B BLCL 24LC 7 AC connection and fuse busbars installation 44 Cabinet construction ...
Страница 45: ...Stage 5 Installation of LCL choke mounting mechanics and LCL ISU connection Cabinet construction 45 ...
Страница 46: ...Stage 6 LCL choke and LCL choke busbar installation 46 Cabinet construction ...
Страница 47: ...Stage 7 Heat exchanger heat exchanger mechanics and cooling components installation Cabinet construction 47 ...
Страница 48: ...Stage 8A BLCL 15LC 7 LCL capacitor support fan support mechanics and fan installation 48 Cabinet construction ...
Страница 49: ...Stage 8B BLCL 24LC 7 LCL capacitor support fan support mechanics and fan installation Cabinet construction 49 ...
Страница 50: ...Stage 9 Installation of LCL shroud kit 50 Cabinet construction ...
Страница 52: ...Overview of kits 52 Cabinet construction ...
Страница 53: ...Stage 1 Installation of common parts Cabinet construction 53 ...
Страница 54: ...Stage 2 Installation of LCL side plates and common AC bus 54 Cabinet construction ...
Страница 55: ...Stage 3 Installation of brackets for Flat PLS holder Cabinet construction 55 ...
Страница 56: ...Stage 4 AC connection and fuse busbars installation 56 Cabinet construction ...
Страница 57: ...Stage 5 Installation of LCL choke mounting mechanics and LCL ISU connection Cabinet construction 57 ...
Страница 58: ...Stage 6 LCL choke and LCL choke busbar installation 58 Cabinet construction ...
Страница 59: ...Stage 7 Heat exchanger heat exchanger mechanics and cooling components installation Cabinet construction 59 ...
Страница 60: ...Stage 8 LCL capacitor support fan support mechanics and fan installation 60 Cabinet construction ...
Страница 61: ...Stage 9 Installation of LCL shroud kit Cabinet construction 61 ...
Страница 65: ...Overview of kits Cabinet construction 65 ...
Страница 66: ...Stage 1 Installation of common parts 66 Cabinet construction ...
Страница 67: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 67 ...
Страница 68: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 68 Cabinet construction ...
Страница 69: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 69 ...
Страница 70: ...Stage 5A Installation of DC busbars 70 Cabinet construction ...
Страница 71: ...Stage 5B Installation of DC switch DC connection and common mode filter busbar kits Cabinet construction 71 ...
Страница 72: ...Stage 6 Module installation 72 Cabinet construction ...
Страница 73: ...Stage 7 Installation of shrouding Cabinet construction 73 ...
Страница 77: ...Overview of kits Cabinet construction 77 ...
Страница 78: ...Stage 1 Installation of common parts 78 Cabinet construction ...
Страница 79: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 79 ...
Страница 80: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 80 Cabinet construction ...
Страница 81: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 81 ...
Страница 82: ...Stage 5A Installation of DC busbars 82 Cabinet construction ...
Страница 83: ...Stage 5B Installation of DC switch DC connection and common mode filter busbar kits Cabinet construction 83 ...
Страница 84: ...Stage 6 Module installation 84 Cabinet construction ...
Страница 85: ...Stage 7 Installation of shrouding Cabinet construction 85 ...
Страница 89: ...Overview of kits Cabinet construction 89 ...
Страница 90: ...Stage 1 Installation of common parts 90 Cabinet construction ...
Страница 91: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 91 ...
Страница 92: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 92 Cabinet construction ...
Страница 93: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 93 ...
Страница 94: ...Stage 5A Installation of DC busbars 94 Cabinet construction ...
Страница 95: ...Stage 5B Installation of DC switch DC connection and common mode filter busbar kits Cabinet construction 95 ...
Страница 96: ...Stage 6 Module installation 96 Cabinet construction ...
Страница 97: ...Stage 7 Installation of shrouding Cabinet construction 97 ...
Страница 98: ...98 ...
Страница 114: ...114 ...
Страница 125: ...a b c Maintenance 125 ...
Страница 180: ...180 ...
Страница 206: ...206 ...
Страница 208: ...Frame R8i module 208 Dimension drawings ...
Страница 209: ... Quick connector Dimension drawings 209 ...
Страница 210: ...LCL filter components Grid side choke BLCL 15LC 7 and BLCL 24LC 7 210 Dimension drawings ...
Страница 211: ... Grid side choke BLCL 25LC 7 Dimension drawings 211 ...
Страница 212: ... Converter side choke BLCL 15LC 7 and BLCL 24LC 7 212 Dimension drawings ...
Страница 213: ... Converter side choke BLCL 25LC 7 Dimension drawings 213 ...
Страница 214: ... Capacitor www tdk electronics tdk com 214 Dimension drawings ...
Страница 276: ...276 ...