Planning the electrical installation 57
Rotor cable shield
To effectively suppress radiated and conducted radio frequency emissions, the shield
conductivity must be at least 1/10 of the phase conductor conductivity. The requirements
are easily met with a copper or aluminium shield. The minimum requirement of the rotor
cable shield of the converter is shown below. It consists of a concentric layer of copper
wires with an open helix of copper tape. The better and tighter the shield, the lower the
emission level and the bearing currents.
Additional US requirements
Type MC continuous corrugated aluminum armor cable with symmetrical grounds or
shielded power cable must be used for the generator cables if metallic conduit is not used.
For North America, 600 V AC cable is accepted up to 500 V AC. 1000 V AC cable is
required above 500 V AC (below 600 V AC). For converters rated over 100 A, the power
cables must be rated for 75 °C (167 °F).
Insulation jacket
Copper wire screen
Helix of copper tape
Cable core
Inner insulation
U2 V2 W2
PE
Converter
U2 V2 W2
PE
Converter
K
L
M
PE
G
3 ~
L1
L3
L2
Concentric Al/Cu shield
Single core cable, shielded or
unshielded
Site main
earth bus of
the wind
turbine
Site main
earth bus of
the wind
turbine
PE
K
L
M
G
3 ~
Separate protective
conductor
A separate PE conductor system is used
only if local safety regulations do not
allow earthing of the converter and the
generator merely through the cable
screen. This solution increases bearing
currents compared to symmetrical
shielded cable, thus causing extra wear.
U2 V2 W2
PE
Converter
Galvanised steel or
copper armour
Separate protective
conductor
Site main earth bus
of the wind turbine
PE
K
L
M
G
3 ~
Содержание ACS800-67LC
Страница 1: ... ABB WIND TURBINE CONVERTERS ACS800 67LC wind turbine converters Hardware manual ...
Страница 4: ......
Страница 16: ...16 Safety instructions ...
Страница 22: ...22 Introduction to the manual ...
Страница 42: ...42 Operation principle and hardware description ...
Страница 52: ...52 Mechanical installation ...
Страница 79: ...Electrical installation 79 3 3 Rotor side cable connection terminals U2 V2 W2 ...
Страница 92: ...92 Maintenance 4 6 5 5 ...
Страница 103: ...Maintenance 103 Bussmann fuses Mersen fuses ...
Страница 109: ...Maintenance 109 5 6 7 ...
Страница 131: ...Technical data 131 Declaration of incorporation ...
Страница 136: ...136 Dimension drawings ACS800 67LC 1075 0575 7 and 1375 0575 7 ...
Страница 137: ...Dimension drawings 137 With 400 mm wide incoming cubicle option C111 ...
Страница 138: ...138 Dimension drawings ACS800 67LC 1375 1125 7 ...
Страница 139: ...Dimension drawings 139 With 400 mm wide incoming cubicle option C111 ...
Страница 140: ...140 Dimension drawings ACS800 67LC 1595 0865 7 and 2035 1125 7 ...
Страница 141: ...Dimension drawings 141 With 400 mm wide incoming cubicle option C111 ...
Страница 143: ...Dimension drawings 143 Options 2H370 and C111 Option 1H371 ...
Страница 144: ...144 Dimension drawings Options 1H371 and C111 Options 2H371 and C111 ...
Страница 145: ...Dimension drawings 145 Option H378 Options H378 and C111 ...
Страница 147: ...Dimension drawings 147 Option 2H372 ...
Страница 148: ...148 Dimension drawings Option 3H372 ...
Страница 149: ...Dimension drawings 149 Option 1H373 ...
Страница 150: ...150 Dimension drawings Option 2H373 ...
Страница 151: ...Dimension drawings 151 Option 3H373 ...
Страница 152: ...152 Dimension drawings Option H375 ...