Electrical installation
61
Wall installed units (US version)
1. Remove the front cover by releasing the retaining clip with a screw driver and
lifting the cover from the bottom outwards.
2. Remove the connection box cover.
3. Remove the gland plate by undoing the fastening screws.
4. Make the cable entry holes in the gland plate by breaking off the suitable knock-
out plates with a screw driver.
5. Fasten the cable glands to the opened holes of the gland plate.
6. Lead the cables through the glands.
7. Fasten the gland plate (3).
8. Connect the grounding conductors of the input and motor cables to the
grounding clamps.
9. Remove the clear plastic shroud as shown in section
.
10. Connect the phase conductors of the input cable to the U1, V1 and W1 terminals
and the phase conductors of the motor cable to the U2, V2 and W2 terminals.
See
Wall installed units (European version)
for cabling figures. In case of a cable
lug installation, use UL listed cable lugs and tools given below or corresponding
to meet UL requirements.
1
2
3
3
4
4
8
8
Содержание ACS800-11
Страница 1: ...ACS800 Hardware Manual ACS800 11 Drives 5 5 to 110 kW ACS800 U11 Drives 7 5 to 125 HP ...
Страница 4: ......
Страница 12: ...Safety instructions 12 ...
Страница 30: ...The ACS800 11 U11 30 ...
Страница 36: ...Mechanical installation 36 ...
Страница 54: ...Planning the electrical installation 54 ...
Страница 59: ...Electrical installation 59 1 2 3 Views of frame size R5 U1 V1 W1 V2 W2 U2 UDC UDC 5 5 PE 6 6 8 9 9 ...
Страница 74: ...Installation checklist 74 ...
Страница 84: ...Operation 84 ...
Страница 104: ...Technical data 102 ...
Страница 105: ...Dimensional drawings 103 Dimensional drawings The dimensions are given in millimetres and inches ...
Страница 108: ...Dimensional drawings 106 ...
Страница 111: ...External 24 V power supply for the RMIO board 109 5 6 7 8 ...
Страница 112: ...External 24 V power supply for the RMIO board 110 ...
Страница 113: ......