Chapter 5 – Commissioning the Drive Section
ACS 600 MultiDrive
5-7
Checks with Voltage
Connected to Drive
Section
Basic checks for the Drive Section when voltage is connected to the
Supply Section and DC busbars.
On-load Checks
The table below is a commissioning checklist for the loaded Drive
Section.
Action
Information
1.
Basic Checks
Check that the Prevention of Unexpected Start (if available)
is working.
1. Stop the drive by a Stop command and wait until the
drive has stopped.
2. Open the Prevention of Unexpected Start switch by
closing the switch on the control desk: the circuit will
open. The lamp (if fitted) on the desk should be lit.
3. Give a Start command. The drive should not start.
4. Reset the drive.
See the circuit diagrams
delivered with the device.
Action
Information
Check the rotation direction of the motor.
Check the pulse encoder functioning (if used)
See
Pulse Encoder Interface
Module NTAC-02 Installation and
Start-up Manual
(EN code
58919730) or
NIOB-01 User’s
Guide
(EN code 64471341).
Check the emergency stop function of the system from each
operating place.
Содержание ACA 6 Series
Страница 4: ......
Страница 8: ...Safety Instructions vi ACS 600 MultiDrive ...
Страница 12: ...x ACS 600 MultiDrive Hardware Manual ...
Страница 26: ...Chapter 1 Introduction 1 14 ACS 600 MultiDrive Hardware Manual ...
Страница 42: ...Chapter 2 Mechanical Installation 2 16 ACA 6xx Sections and ACS ACC 6x7 132 to 3000 kW Frequency Converters ...
Страница 100: ...Chapter 6 Preventive Maintenance 6 6 ACS 600 MultiDrive ...
Страница 101: ......