background image

2

2.1

Mounting

a) Dimensions of the flange and fixing holes are shown in Fig.

1 together with overall dimensions of the complete system.

b) Since the associated measuring instrument has to be set

up with the electrode immersed in standardising solutions,
the electrode system should not be bolted into place until
the standardisation procedure (see under OPERATION)
has been carried out. Correct alignment of the fixing holes
for the installation should however be checked before
standardisation.

c) It is important to ensure that the system is so positioned as

to ensure a positive head of 300 to 600mm (12 to 24in) of
salt bridge solution relative to the liquid being measured.

2.2

Electrical Connections

The connecting cable is fitted with a waterproof coaxial plug or
tagged ends.

a) Remove the protecting end cap (supplied with the versions

fitted with coaxial connectors) and retain it for future use. It
will be required if the electrode assembly is removed or
otherwise disconnected from the measuring instrument.

b) Ensure that any dirt or grease in the plug and associated

socket connected to the measuring instrument is removed
by carefully wiping with a rag moistened with a suitable
solvent e.g. propanol.

c) Connect the plug and socket and make watertight by

overlapping the rubber sleeves provided.

d) For electrodes with cables terminating in tagged ends,

connect the individual tags to the input terminal block of the
pH meter, as described in the instruction manual for the pH
meter.

3.1

Activation of Electrodes

Before use, depending on the type of electrode assembly a
period of activation may be required. Full details are given in
the booklet provided with the electrode assembly.

3.2

Assembly of the System

a) Remove the split rubber bung from the cap on the upper

end of the system.

b) Fit the smaller of the ceramic plugs to the side of the

electrode system tube (See Fig. 1) using the special
wrench supplied in the accessory kit. If the sample causes
blockage of the ceramic, replace the plug with the larger
one, which will allow a higher flow of salt bridge solution.

c) Thread the coaxial cable from the electrode assembly up

through the bottom end of the system so that it passes out
through the cap on the upper end.

d) Remove the neoprene cap from the salt bridge solution

entry tube of the reference element (at the upper end of the
electrode assembly).

Note.

 There should be a minimum of delay between

carrying out this step and the filling of the system with salt
bridge solution (see below).

e) Screw the electrode assembly into the system and tighten

firmly until it is flush.

f)

Unscrew the cap on the upper end of the system. There is
no need to remove it from the coaxial cable.

g) Holding the system upright, fill with salt bridge solution

(saturated potassium chloride) until the level can be seen
to be near to the top of the transparent section. Add a few
grammes of KCl crystals to keep the solution saturated.

h) Place the screw cap on the upper end of the system.

i)

Fit the coaxial cable into the split rubber bung and place it
in the cap.

3.3

Standardisation pH

This consists of setting up the associated measuring
instrument to read correctly with the electrode in the system
immersed in suitable standard solutions. The procedure is fully
described in the appropriate instrument manual.

Note. When using a glass electrode assembly the check
reading to be expected is between 6.7pH and 7.3pH.

When the standardisation procedure has been carried out,
complete the installation of the system.

2

INSTALLATION

3

PREPARATION FOR USE

Содержание 2867 Series

Страница 1: ...ctrode systems Measurement made easy For more information A Data Sheet is also available for free download from www abb com analytical or by scanning this code Search for or click on Data Sheet DS 2867 EN 2867 series pH and Redox ORP industrial dip electrode systems 2867 series pH redox ORP electrode systems ...

Страница 2: ...observed Installation operation maintenance and servicing must only be carried out by suitably trained personnel and in accordance with the information given Normal safety precautions must be taken to avoid the possibility of an accident occurring when operating in conditions of high pressure and or temperature Chemicals must be stored away from heat protected from temperature extremes and powders...

Страница 3: ...nimum 1 2 Ancillary Equipment Electrode Assemblies Dual electrodes specially designed for use with the Model 2867 system are available as assemblies for direct mounting The assembly consists of a combined measuring reference electrode contained in an ABS plastic tube The membrane of the measuring electrode projects through the lower end of the tube the reference element projects through the upper ...

Страница 4: ... electrode assembly 3 2 Assembly of the System a Remove the split rubber bung from the cap on the upper end of the system b Fit the smaller of the ceramic plugs to the side of the electrode system tube See Fig 1 using the special wrench supplied in the accessory kit If the sample causes blockage of the ceramic replace the plug with the larger one which will allow a higher flow of salt bridge solut...

Страница 5: ...experience 4 3 Cleaning a The need for cleaning the electrode becomes apparent when the response becomes sluggish with possibly a falling off in calibration b If the cleaning procedures described below do not eliminate these symptoms the electrode assembly and or ceramic plug should be changed c During cleaning avoid rough handling of the electrode membrane Wiping with a cloth soaked in suitable s...

Страница 6: ...en supplied c Remove the system tube from the sampling point ensuring that the process solution is not under pressure KEEP TUBE UPRIGHT d Rinse off the solution so that the electrode assembly may be handled e Remove the split rubber bung holding the coaxial cable in place in the upper end of the system f Unscrew the cap in the upper end of the system and empty the salt bridge solution into a clean...

Страница 7: ...b m e m e d o r t c e l E b s t f i r d g n i d a e r r o t a c i d n I 3 g u l p e h t e g n a h c r o n a e l C y t r i d r o d e k c o l b g u l p c i m a r e C a y l b m e s s a e d o r t c e l e w e n a y r T d e h t r a e d a e l e d o r t c e l e e c n e r e f e R b t l a s f o d a e h t n e i c i f f u s n i o t e u d e b d l u o C d e n o s i o p e d o r t c e l e e c n e r e f e R c c i ...

Страница 8: ... g n i t n u o m e c a f r u s e g n a l f g n i t n u o M 0 4 6 7 6 8 2 g n i t n u o m l l a w t e k c a r b g n i t n u o M 0 7 5 7 6 8 2 r e p p o t s r e b b u r t i l p S 0 2 4 7 6 8 2 When ordering spares always quote the Part No Spares should be ordered from ABB Limited Oldends Lane Stonehouse Gloucestershire GL10 3TA England r e b m u N t r a P c i m a r e c d n a s g n i r O g n i n i a ...

Страница 9: ...7 640 O Ring seal 0211 188 fits here Hole tapped 1 8 in BSP for ceramic plug assembly Optional bracket for wall mounting Part No 2867 570 114 3 mm 4 1 2 in dia 89 mm 3 1 2 in 2 holes 6 3 mm 1 4 in diameter 855 mm 33 5 8 in or 450 mm 17 3 4 in 270 mm 10 5 8 in 25 4 mm 1 in 64 mm 2 1 2 in 73 mm 2 7 8 in 127 mm 5 in 1160 mm 45 5 8 in or 755 mm 29 3 4 in 715 mm 28 1 8 in or 322 mm 12 11 16 in 140 mm 5...

Страница 10: ...8 NOTES ...

Страница 11: ...Sales Service ...

Страница 12: ...ghts in this document and in the subject matter and illustrations contained therein Any reproduction disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB ABB 2018 ABB Limited Measurement Analytics Oldends Lane Stonehouse Gloucestershire GL10 3TA UK Tel 44 0 1453 826 661 Fax 44 0 1453 829 671 Email instrumentation gb abb c...