ABB 2867 Series Скачать руководство пользователя страница 6

4

Heavy Non-Greasy Deposits: (e.g. rust, chalk)

Wipe` with cotton wool soaked in concentrated HCl to remove
the deposit, and rinse thoroughly. Soak the electrode for a few
hours in 0.1M HCl and then wash in water. An alternative
treatment is to wipe the electrode and soak it overnight (or
longer if necessary) in a 10% solution of E.D.T.A. followed by
reactivation in 0.1M HCl and rinsing in water.
Heavy deposits formed during effluent neutralisation are often
removed by using a 1:1 mixture of concentrated HCl and
water.

4.3.2

Platinum Electrodes:

In general, the same procedures may be used as for glass
electrodes. They may also be cleaned cathodically.

4.3.3

Antimony Electrodes

Emery paper or a file should be used

4.3.4

Ceramic Plug:

The same procedures may be used as for glass electrodes,
but lengthy soaking should not be necessary. In general, the
ceramic plug need not be removed. A heavily fouled ceramic
plug may still perform satisfactorily, but if found to be the
source of reduced system performance the plug and seal
should be replaced together. The seal is removed by careful
easing out with a spanner or the special wrench provided.

4.4

Care of Plugs and Sockets

Plugs and Sockets should be examined every time they are
disconnected. Dirt or grease should be removed by wiping with
a clean cloth moistened with a solvent e.g. propanol. The
centre contact of sockets should also be examined to make
sure that the two halves have not spread too far apart to grip
the plug contact firmly. Gentle pressure with pliers should be
used to bring the contacts together again.

5.1

Removal of Electrode Assembly

The procedure is as follows:

a) Disconnect the waterproof plug on the coaxial cable

connected to the electrode system from the coaxial socket
connected to the measuring instrument.

b) Fit the waterproof cap to the coaxial plug (when supplied)

c) Remove the system tube from the sampling point, ensuring

that the process solution is not under pressure. 

KEEP

TUBE UPRIGHT.

d) Rinse off the solution so that the electrode assembly may

be handled.

e) Remove the split rubber bung holding the coaxial cable in

place in the upper end of the system.

f)

Unscrew the cap in the upper end of the system and empty
the salt bridge solution into a clean vessel (the solution
may be kept and used for refilling).

g) Hold the end of the electrode assembly in one hand and

the lower part of the system tube in the other.  Unscrew the
electrode assembly anticlockwise until it is free of the
system.

h) Remove the screw cap from the coaxial cable by passing it

over the plug end.

i)

Gently draw the coaxial cable and plug through the system
tube so that the electrode assembly and cable are free.

j)

Hold the system tube upside down and wipe the inside,
where the electrode assembly fits, with absorbent paper.
This prevents a layer of KCl crystals forming as any salt
bridge solution left dries out.

5.1.2

Replacement of Electrode assembly

Carry out the procedure described under 

3 PREPARATION

FOR USE

, removing the cap from the reference element if the

assembly is a new one.

5.2

Fault Finding

The location of a fault is best found by fitting a replacement
electrode assembly and carrying out a standardisation check.
If changing the electrode assembly clears the fault, then the
assembly is faulty and should be checked to see if it can be
restored to working order. If, after cleaning and reactivating the
electrode assembly, cleaning or changing the ceramic plug
and refilling with fresh salt bridge solution, there is no
improvement, then the old electrode assembly should be
discarded.

If the fault is in neither the electrode assembly nor the ceramic
plug, it must be assumed that the measuring instrument or its
connections are faulty.
The following is a short (and by no means exhaustive) list of
fault symptoms and the possible causes due to faulty
electrodes.

…4

ROUTINE MAINTENANCE

5

SERVICING

Содержание 2867 Series

Страница 1: ...ctrode systems Measurement made easy For more information A Data Sheet is also available for free download from www abb com analytical or by scanning this code Search for or click on Data Sheet DS 2867 EN 2867 series pH and Redox ORP industrial dip electrode systems 2867 series pH redox ORP electrode systems ...

Страница 2: ...observed Installation operation maintenance and servicing must only be carried out by suitably trained personnel and in accordance with the information given Normal safety precautions must be taken to avoid the possibility of an accident occurring when operating in conditions of high pressure and or temperature Chemicals must be stored away from heat protected from temperature extremes and powders...

Страница 3: ...nimum 1 2 Ancillary Equipment Electrode Assemblies Dual electrodes specially designed for use with the Model 2867 system are available as assemblies for direct mounting The assembly consists of a combined measuring reference electrode contained in an ABS plastic tube The membrane of the measuring electrode projects through the lower end of the tube the reference element projects through the upper ...

Страница 4: ... electrode assembly 3 2 Assembly of the System a Remove the split rubber bung from the cap on the upper end of the system b Fit the smaller of the ceramic plugs to the side of the electrode system tube See Fig 1 using the special wrench supplied in the accessory kit If the sample causes blockage of the ceramic replace the plug with the larger one which will allow a higher flow of salt bridge solut...

Страница 5: ...experience 4 3 Cleaning a The need for cleaning the electrode becomes apparent when the response becomes sluggish with possibly a falling off in calibration b If the cleaning procedures described below do not eliminate these symptoms the electrode assembly and or ceramic plug should be changed c During cleaning avoid rough handling of the electrode membrane Wiping with a cloth soaked in suitable s...

Страница 6: ...en supplied c Remove the system tube from the sampling point ensuring that the process solution is not under pressure KEEP TUBE UPRIGHT d Rinse off the solution so that the electrode assembly may be handled e Remove the split rubber bung holding the coaxial cable in place in the upper end of the system f Unscrew the cap in the upper end of the system and empty the salt bridge solution into a clean...

Страница 7: ...b m e m e d o r t c e l E b s t f i r d g n i d a e r r o t a c i d n I 3 g u l p e h t e g n a h c r o n a e l C y t r i d r o d e k c o l b g u l p c i m a r e C a y l b m e s s a e d o r t c e l e w e n a y r T d e h t r a e d a e l e d o r t c e l e e c n e r e f e R b t l a s f o d a e h t n e i c i f f u s n i o t e u d e b d l u o C d e n o s i o p e d o r t c e l e e c n e r e f e R c c i ...

Страница 8: ... g n i t n u o m e c a f r u s e g n a l f g n i t n u o M 0 4 6 7 6 8 2 g n i t n u o m l l a w t e k c a r b g n i t n u o M 0 7 5 7 6 8 2 r e p p o t s r e b b u r t i l p S 0 2 4 7 6 8 2 When ordering spares always quote the Part No Spares should be ordered from ABB Limited Oldends Lane Stonehouse Gloucestershire GL10 3TA England r e b m u N t r a P c i m a r e c d n a s g n i r O g n i n i a ...

Страница 9: ...7 640 O Ring seal 0211 188 fits here Hole tapped 1 8 in BSP for ceramic plug assembly Optional bracket for wall mounting Part No 2867 570 114 3 mm 4 1 2 in dia 89 mm 3 1 2 in 2 holes 6 3 mm 1 4 in diameter 855 mm 33 5 8 in or 450 mm 17 3 4 in 270 mm 10 5 8 in 25 4 mm 1 in 64 mm 2 1 2 in 73 mm 2 7 8 in 127 mm 5 in 1160 mm 45 5 8 in or 755 mm 29 3 4 in 715 mm 28 1 8 in or 322 mm 12 11 16 in 140 mm 5...

Страница 10: ...8 NOTES ...

Страница 11: ...Sales Service ...

Страница 12: ...ghts in this document and in the subject matter and illustrations contained therein Any reproduction disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB ABB 2018 ABB Limited Measurement Analytics Oldends Lane Stonehouse Gloucestershire GL10 3TA UK Tel 44 0 1453 826 661 Fax 44 0 1453 829 671 Email instrumentation gb abb c...

Отзывы: