Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
23
4.
Carefully lift the bushing from the floor.
CAUTION!
Make sure that the bushing does not
rotate.
G007349
5.
Lift the bushing up from the floor with both cranes.
1.
Lift the upper part of the bushing. Stop when
the bushing is in a vertical position.
2.
Remove the lower soft lifting slings to the
crane.
3.
Remove the flange lifting tool (88).
CAUTION!
Do not let the bushing come in contact
with the floor while raising the bushing
to a vertical position. Contact with the
floor can cause damage to the
bushing.
G007350
6.
Lift the bushing to a position above the transformer.
CAUTION!
Make sure that the bushing does not rotate.
7.
Align the bushing with the hole in the transformer turret.
End of instruction
Содержание 1ZSC902110-AAA
Страница 12: ...12 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Страница 18: ...18 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Страница 78: ...78 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Страница 82: ...82 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...