background image

Sherborne Wood & Multifuel Stoves

5

INTRODUCTION

SAFETY

A fireguard conforming to BS 8423: 2002 should
be used in the presence of children and old/or
infirm people. If the appliance is used with the fire
door open, a spark guard conforming to BS 3248
should be fitted.

Do not use aerosol sprays or any other flame
near the appliance under fire.
Do not fit an extractor fan in the same room as
the appliance.
Fire cement is caustic, hand and eye protection
should always be worn, prolonged contact with
the skin should be avoided.
Aarrow Fires Ltd will not be responsible for any
consequential or incidental loss or injury
however caused.

Before continuing any further with the installation
of this appliance please read the following guide to
manual handling.

•  Always obtain assistance when lifting the

appliance.

• When lifting always keep your back 

straight. Bend your legs not your back.

• Avoid twisting at the waist. It is better to

reposition your feet.

• Avoid upper body/top heavy bending. Do not     

lean forwards or sideways when
handling the fire.

• Always grip with the palms of your hands.

Do not use fingertips for support.

• Always keep the stove as close to the body as

possible. This will minimise the cantilever
action.

• Use gloves to provide additional grip.  

THE PRINCIPLE OF THE FIRE

Your Aarrow Fire is built to the highest standard of
craftsmanship using the best materials and the most
modern equipment available. It is a highly efficient
and sophisticated piece of machinery and when
properly installed and operated it should provide a
lifetime of heating satisfaction.

Safety

is the most important consideration when

installing your fire. If not properly installed and
operated a house fire may result. installation must
comply with the Building Regulations and conform
to all relevant fire safety standards.

Aarrow Fires produce a variety of appliances
ranging from units, which are traditional in style to
stoves which are modern in appearance, all
bristling with "High Tech" features.

Model types include simple room heaters,
convectors, integral boiler models and inset units.
Your Aarrow Fire is constructed from either single
or twin wall steel strengthened where necessary.
Cast iron is used where appropriate for decorative
features.

All fire doors are fitted with special high
temperature ceramic glass panels through which
the fire can be viewed.

Multifuel stoves are fitted with a cast iron grate to
give full multifuel facility and positive de-ashing. 

All models except integral boiler models are lined
with firebricks or heat reflective panels which
ensure complete combustion and provide a good
heat store to even out fluctuations in burning.

An internal throat plate produces turbulence to
encourage secondary combustion and directs the
flue gas around the whole upper firebox before
allowing it to escape up the chimney.

On multifuel appliances the primary air for burning
enters the ash pit chamber beneath the grate,
controlled by the air inlet mechanism.  

Aarrow Fires are also fitted with an "air wash" so
called because it provides a curtain of high speed
preheated air behind the glass to help keep it clean
and to provide secondary air/over draught.

The provision of two inlets on all multifuel stoves
gives a wide range of primary air/secondary air,
under draught/over draught combinations. 
The optimum settings will only be established by
experience in firing the appliance, and will depend
on type of fuel, the   position of the appliance in the
house, condition of chimney etc.

Содержание Sherborne Large Multifuel

Страница 1: ...Great Britain Tel 44 01308 427234 Fax 44 01308 423441 www aarrowfires com Wood Multifuel Stoves Operating Installation Manual PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE Sherborne Medium Mu...

Страница 2: ...re so confident in the reliability of our product that we offer a Lifetime Guarantee Should you have any questions about our Sherborne range of stoves that are not covered in this manual please contac...

Страница 3: ...12 Extended Burning 12 Over Firing 13 Ash Removal 13 SERVICING Cleaning Annual Maintenance 13 14 Accessories 15 INSTALLATION Page General Precautions 16 Handling 16 Hearth 16 Combustible Materials 16...

Страница 4: ...ED IN THIS APPLIANCE TO USE THESE FUELS WILL INVALIDATE THE APPLIANCE GUARANTEE IF IN DOUBT CONTACT THE SOLID FUEL ASSOCIATION TELEPHONE NUMBER 0800 600 000 www solidfuel co uk THE USE OF SPARE PARTS...

Страница 5: ...roperly installed and operated a house fire may result installation must comply with the Building Regulations and conform to all relevant fire safety standards Aarrow Fires produce a variety of applia...

Страница 6: ...tplate 7 Operating tool 1 8 Rear liner 2 9 Side liners 2 N A Sherborne Medium Wood 2 1 1 5 1 2 2 Sherborne Medium Multifuel N A Sherborne Small Wood 1 5 1 2 2 9 2 1 1 5 1 2 2 Sherborne Large Wood N A...

Страница 7: ...o Centre of Rear Flue Depth from Back to Centre of Flue mm Flue Diameter 127 5 Weight Packed Kg 2 8 Sherborne Medium Wood 9 127 5 Sherborne Medium Multifuel 1 5 6 Sherborne Small Wood 8 395 127 5 2 8...

Страница 8: ...providing under draught to the base of the fire chamber through the controls on the doors of the fires PRIMARY AIR FOR SHERBORNE On the Sherborne primary air enters the appliance through the controls...

Страница 9: ...ld and unlit The door s should be lifted off the hinges so that the below operations can be carried out on a workbench or similar level surface Unscrew the two nuts on the inside of the door securing...

Страница 10: ...hinges Gently tap the two hinge pins in a direction to compensate for the misalignment Fig 9 Refit the door and check to ensure it now sits square to the body if not repeat above steps Fig 9 Adjusting...

Страница 11: ...heat Blazebrite Taybrite Sunbrite Doubles Singles Anthracite Large Nuts and Welsh Dry Steam Coal Large Small Nuts Approval does not cover the use of other fuels either alone or mixed with the suitable...

Страница 12: ...as for manufactured smokeless fuel Leave the air inlet control open about a quarter or less Note The high temperature paint acquires durability by being cured during the initial firings of the applia...

Страница 13: ...se an injury Replace the ash pan and close the fire door CLINKER The formation of clinker suggests that the unit is being over fired Any clinker forming on the grate should be removed when cold OVER F...

Страница 14: ...tainconditions such as burning at a low rate with damp wood or overnight burning the glass may become somewhat blackened To remedy this operate the appliance at a fast rate Alternatively when the stov...

Страница 15: ...ns on add in boilers PAINT Matching aerosol paint to tone in any connecting flues pipes or surrounding metalwork TRACERIES Please note traceries will be available at a later date ADD ON CANOPIES Optio...

Страница 16: ...on HEARTH The fire should be installed to stand on a constructional hearth of non combustible materials not less than 125mm 5 thick conforming to Building Regulations Dimensions of the hearth should p...

Страница 17: ...long centre tab on the back edge rests on the rear liners The shorter turn down tabs against the vertical face Replace the front fuel retainer bars Note Neither the rear firebox liners nor the side f...

Страница 18: ...ng end marked L onto the low section of the comb The upper bar is fitted in a similar manner but with the end marked L inserted in the rear channel and the end marked H seated on the high section of t...

Страница 19: ...lation and are interchangeable These are fitted as follows To fit the interchangeable canopy Fig 10c Remove the front clamps Tilt the canopy as shown in stage 1 Engage the rear clips and pull fully fo...

Страница 20: ...fumes from the stove outlet to the outside air To ensure a good updraught it is important that the flue gases are kept warm and that the flue size suits the stove The termination of the outlet at the...

Страница 21: ...ument J of the Building Regulations for England and Wales is available from The Stationery Bookshops and can also be viewed at the ODPM website at www safety odpm gov uk bregs brads htm Details on the...

Страница 22: ...22 Sherborne Wood Multifuel Stoves INSTALLATION...

Страница 23: ...ULATED FLUES TYPICAL METAL INSULATED CHIMNEY SYSTEM TO BE INSTALLED TO THE CHIMNEY MANUFACTURERS INSTRUCTIONS IN COMPLIANCE WITH BUILDING REGULATIONS AND BS7566 PTS 1 4 A is minimum clearance for non...

Страница 24: ...stems should be carried out by a qualified heating engineer In many cases your supplier will be able to offer advice and assistance Direct Systems Stainless steel boilers either factory fitted or retr...

Страница 25: ...ipe from the expansion tank should be 28mm diameter copper Pipes in unheated spaces must be lagged FINAL CHECK Before handing over the installation to the customer it is strongly recommended that the...

Страница 26: ...s appliances only c If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and state jointing materials used d If an existing chimney has been refurbish...

Страница 27: ...roat Plate 3 Grate Bar Set 4 Hot Plate 5 Operating Tool 6 Ashpan 7 Flue Spigot Part Description Visual Aid not to scale Sherborne Small Wood Sherborne Small Multifuel Sherborne Medium Wood AFS1191 AFS...

Страница 28: ...Glass Clips 13 Hinge kit Comprises 2 Hinges 4 Fixings Per Set 14 Airwash Curved Part Description Visual Aid not to scale Sherborne Small Wood Sherborne Small Multifuel Sherborne Medium Wood AFS1163 AF...

Страница 29: ...skets Clips and Seal 19 Fire Door Locking Assembly 20 Wood Burning Tray 21 Multifuel Upgrade Kit Part Description Visual Aid not to scale SHBS MGRATE AFS1021 L H AFS1238 R H AFS1239 AFS1237 AFS1236 AF...

Страница 30: ...a qualified heating engineer The Manufacturers decision shall be final If your appliance proves to be defective as a result of faulty materials or workmanship during guarantee we will repair or repla...

Страница 31: ...is manual please contact your Aarrow retailer Please keep all repair receipts safely Please ensure you have this manual available when an engineer visits as they will complete the service record chart...

Страница 32: ...I ve checked it and it s O K Assembled by Checked by Date of Purchase Name and address of supplier Please ensure installer completes INSTALLATION CHECK LIST details on page 26 of this manual If an add...

Отзывы: