background image

Remove the firebricks lining and throat plate,
inspect all gasketing on doors, glass etc., and
re-order any items that may need replacing, from
your Aarrow dealer. With a wire brush clean inside
the appliance paying particular attention to the
small inlet holes of the air wash on the inside,
above the fire door and to the door. 

Sweep the chimney and confirm that it is sound.
Examine all joints in the flue pipe etc., and re-seal
if necessary. Reassemble and leave with the air
inlet and air wash control about half way open. This
will allow a free flow of air through the appliance
thus preventing moisture and condensation from
building up inside the fire and chimney.

CHIMNEY SWEEPING

Sweeping should be carried out with an appropriate
sized bristle brush and rods to suit chimney size and
type. As with all appliances regular sweeping of the flue
is essential to avoid the danger of blockage and the
escape of  poisonous fumes. Access for cleaning should
also be incorporated in the chimney (e.g. soot door or
access through register plate).

Any existing chimney should be swept prior to
installation of the appliance, and swept again a
second time 

within one month 

of regular use after

installation to establish frequency of sweeping
required. This should be done by a competent
person such as a NACS chimney engineer who will
provide a Certificate of Chimney Sweeping.

Sweep the whole flue way, including the outlet, at
least twice per burning season. It is important that
the flue ways, flue pipe and chimney be cleaned
prior to lighting the fire after a prolonged
shut-down period.

DOOR GLASS

The door glass should remain clear during normal
daytime burning. However under certain conditions-such
as burning at a low rate with damp wood, or overnight
burning, the glass may become somewhat blackened. To
remedy this, operate the appliance at a fast rate.
Alternatively when the stove is cold open the door and
clean the inside face of the glass with a damp cloth or
with glass cleaner  (available from fire stockists). Apiece
of cloth moistened with vinegar and dipped in wood ash

not coal ash

- will provide a good soft scourer to

remove the soot without scratching the glass.

OUTER FINISH

The outside finish of the appliance is a durable high
temperature paint. It is best cleaned by brushing
down with a clean shoe brush. Do not allow
moisture to remain on the appliance whilst cold or
surface rust may form.

The high temperature paint should not require
attention for some time, depending on use. The
hotter the fire burns the sooner repainting will be
necessary. Aerosol tins of paint are available for
complete refurbishing. Before repainting make sure
that the fire is out and is cold.

•Remove the door glass.
•Lightly wire brush, or rub with wire wool, the 

body of the appliance to remove any loose paint  
powder.

•Mask or remove items such as brass work.
•Any adjacent brickwork, mantelpiece, hearth, 

etc., should be carefully masked for quite a 
distance around the appliance. (this precaution is 

to prevent discolouration of the surrounding brick

work, wallpaper etc).

Re-spray in a well-ventilated area - avoid breathing
the vapour. Refer to safety instructions on paint
cans. 

•When the paint is dry refit door glass and any 

other parts previously removed.

•Leave the appliance for eight hours before

re-lighting. 

•Burn slowly for the first four hours, then build up 

heat gradually to cure the paint.

Note: Use only genuine Aarrow touch-up spray as
some paints interact. This could ruin the finish
and invalidate the guarantee.

14

Sherborne Wood & Multifuel Stoves

SERVICING

Содержание Sherborne Large Multifuel

Страница 1: ...Great Britain Tel 44 01308 427234 Fax 44 01308 423441 www aarrowfires com Wood Multifuel Stoves Operating Installation Manual PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE Sherborne Medium Mu...

Страница 2: ...re so confident in the reliability of our product that we offer a Lifetime Guarantee Should you have any questions about our Sherborne range of stoves that are not covered in this manual please contac...

Страница 3: ...12 Extended Burning 12 Over Firing 13 Ash Removal 13 SERVICING Cleaning Annual Maintenance 13 14 Accessories 15 INSTALLATION Page General Precautions 16 Handling 16 Hearth 16 Combustible Materials 16...

Страница 4: ...ED IN THIS APPLIANCE TO USE THESE FUELS WILL INVALIDATE THE APPLIANCE GUARANTEE IF IN DOUBT CONTACT THE SOLID FUEL ASSOCIATION TELEPHONE NUMBER 0800 600 000 www solidfuel co uk THE USE OF SPARE PARTS...

Страница 5: ...roperly installed and operated a house fire may result installation must comply with the Building Regulations and conform to all relevant fire safety standards Aarrow Fires produce a variety of applia...

Страница 6: ...tplate 7 Operating tool 1 8 Rear liner 2 9 Side liners 2 N A Sherborne Medium Wood 2 1 1 5 1 2 2 Sherborne Medium Multifuel N A Sherborne Small Wood 1 5 1 2 2 9 2 1 1 5 1 2 2 Sherborne Large Wood N A...

Страница 7: ...o Centre of Rear Flue Depth from Back to Centre of Flue mm Flue Diameter 127 5 Weight Packed Kg 2 8 Sherborne Medium Wood 9 127 5 Sherborne Medium Multifuel 1 5 6 Sherborne Small Wood 8 395 127 5 2 8...

Страница 8: ...providing under draught to the base of the fire chamber through the controls on the doors of the fires PRIMARY AIR FOR SHERBORNE On the Sherborne primary air enters the appliance through the controls...

Страница 9: ...ld and unlit The door s should be lifted off the hinges so that the below operations can be carried out on a workbench or similar level surface Unscrew the two nuts on the inside of the door securing...

Страница 10: ...hinges Gently tap the two hinge pins in a direction to compensate for the misalignment Fig 9 Refit the door and check to ensure it now sits square to the body if not repeat above steps Fig 9 Adjusting...

Страница 11: ...heat Blazebrite Taybrite Sunbrite Doubles Singles Anthracite Large Nuts and Welsh Dry Steam Coal Large Small Nuts Approval does not cover the use of other fuels either alone or mixed with the suitable...

Страница 12: ...as for manufactured smokeless fuel Leave the air inlet control open about a quarter or less Note The high temperature paint acquires durability by being cured during the initial firings of the applia...

Страница 13: ...se an injury Replace the ash pan and close the fire door CLINKER The formation of clinker suggests that the unit is being over fired Any clinker forming on the grate should be removed when cold OVER F...

Страница 14: ...tainconditions such as burning at a low rate with damp wood or overnight burning the glass may become somewhat blackened To remedy this operate the appliance at a fast rate Alternatively when the stov...

Страница 15: ...ns on add in boilers PAINT Matching aerosol paint to tone in any connecting flues pipes or surrounding metalwork TRACERIES Please note traceries will be available at a later date ADD ON CANOPIES Optio...

Страница 16: ...on HEARTH The fire should be installed to stand on a constructional hearth of non combustible materials not less than 125mm 5 thick conforming to Building Regulations Dimensions of the hearth should p...

Страница 17: ...long centre tab on the back edge rests on the rear liners The shorter turn down tabs against the vertical face Replace the front fuel retainer bars Note Neither the rear firebox liners nor the side f...

Страница 18: ...ng end marked L onto the low section of the comb The upper bar is fitted in a similar manner but with the end marked L inserted in the rear channel and the end marked H seated on the high section of t...

Страница 19: ...lation and are interchangeable These are fitted as follows To fit the interchangeable canopy Fig 10c Remove the front clamps Tilt the canopy as shown in stage 1 Engage the rear clips and pull fully fo...

Страница 20: ...fumes from the stove outlet to the outside air To ensure a good updraught it is important that the flue gases are kept warm and that the flue size suits the stove The termination of the outlet at the...

Страница 21: ...ument J of the Building Regulations for England and Wales is available from The Stationery Bookshops and can also be viewed at the ODPM website at www safety odpm gov uk bregs brads htm Details on the...

Страница 22: ...22 Sherborne Wood Multifuel Stoves INSTALLATION...

Страница 23: ...ULATED FLUES TYPICAL METAL INSULATED CHIMNEY SYSTEM TO BE INSTALLED TO THE CHIMNEY MANUFACTURERS INSTRUCTIONS IN COMPLIANCE WITH BUILDING REGULATIONS AND BS7566 PTS 1 4 A is minimum clearance for non...

Страница 24: ...stems should be carried out by a qualified heating engineer In many cases your supplier will be able to offer advice and assistance Direct Systems Stainless steel boilers either factory fitted or retr...

Страница 25: ...ipe from the expansion tank should be 28mm diameter copper Pipes in unheated spaces must be lagged FINAL CHECK Before handing over the installation to the customer it is strongly recommended that the...

Страница 26: ...s appliances only c If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and state jointing materials used d If an existing chimney has been refurbish...

Страница 27: ...roat Plate 3 Grate Bar Set 4 Hot Plate 5 Operating Tool 6 Ashpan 7 Flue Spigot Part Description Visual Aid not to scale Sherborne Small Wood Sherborne Small Multifuel Sherborne Medium Wood AFS1191 AFS...

Страница 28: ...Glass Clips 13 Hinge kit Comprises 2 Hinges 4 Fixings Per Set 14 Airwash Curved Part Description Visual Aid not to scale Sherborne Small Wood Sherborne Small Multifuel Sherborne Medium Wood AFS1163 AF...

Страница 29: ...skets Clips and Seal 19 Fire Door Locking Assembly 20 Wood Burning Tray 21 Multifuel Upgrade Kit Part Description Visual Aid not to scale SHBS MGRATE AFS1021 L H AFS1238 R H AFS1239 AFS1237 AFS1236 AF...

Страница 30: ...a qualified heating engineer The Manufacturers decision shall be final If your appliance proves to be defective as a result of faulty materials or workmanship during guarantee we will repair or repla...

Страница 31: ...is manual please contact your Aarrow retailer Please keep all repair receipts safely Please ensure you have this manual available when an engineer visits as they will complete the service record chart...

Страница 32: ...I ve checked it and it s O K Assembled by Checked by Date of Purchase Name and address of supplier Please ensure installer completes INSTALLATION CHECK LIST details on page 26 of this manual If an add...

Отзывы: