background image

24

Sherborne Wood & Multifuel Stoves

INSTALLATION

ADD IN BOILERS

Sherborne

Wood and Multifuel stoves offer the

option of  a slab boiler, which occupies the position
of the rear firebox liner panels.

Fitting:

•Remove the fuel retainers, rear firebox liner 

panels and throat plate.

•Knock out the blanking discs in the back 

plate corresponding to the terminals on the  
boiler.

•Introduce the boiler to the appliance 

through the main fire door and locate the 
terminal pipes through the back plate holes 
and seal around boiler terminals with fire 
cement.

•Engage locking nuts to the thread of the 

terminals and tighten to secure the boiler in 
position, ready for connection to flow and 
return pipes.

•Replace throat plate and fuel retainers.

Note: On boilers the terminal which is
approximately flush with the edge of the boiler
must be fitted uppermost, to prevent "Kettling".

WATER CONNECTIONS

Heating systems

The size of the heating system which can be run,
will depend on the output rating of the appliance. 
It will be necessary to work out heat loss
calculations for the system proposed in order to
establish the kW/hr rating. An appliance that will
meet this figure can then be chosen; (for boiler
outputs please refer to the brochure).

The constructional requirements of installing and
connecting the appliance also need to be taken into
account when selecting. Design and calculations
for individual heating systems should be carried out
by a qualified heating engineer. In many cases your
supplier will be able to offer advice and assistance.

Direct Systems

Stainless steel boilers, either factory fitted or
retro-fitted as add-in boilers enable connection to
direct systems to be made without the need to
change the cylinder or to fit an expansion tank. This
applies to domestic water supply only 

and should

not be done when in an area with soft water.

If

radiators are used then an indirect system must be
utilised.

To connect the cylinder use 28mm copper pipes.
Ensure that the pipes rise continuously to the
cylinder.

Ensure that the runs are not too long, i.e. 20ft
maximum each for flow and return. Install the
cylinder above the level of the fire, and as close to
it as possible. (the higher the cylinder the faster the
circulation). Ensure that no valves are present in the
circulating pipes.

Indirect Systems- The Domestic Hot Water
Circuit

In addition to providing hot water the primary
circuit is essential in providing a "heat leak" to
absorb excessive heat produced in the event of the
circulation pump shutting down.
Heat is produced in varying quantities while the
fire is alight and care must be taken to ensure that
effective circulation can occur around the primary
circuit to carry heat away and thus stop boiling. The
output of any radiator installed as a "heat leak"
should not be less than 10% of the rated output of
the appliance. The radiator should 

not

be fitted

with a control valve.
The cylinder must be of the indirect type with a
minimum capacity of 110 litres, conforming to
BS 1566 part 1.

Содержание Sherborne Large Multifuel

Страница 1: ...Great Britain Tel 44 01308 427234 Fax 44 01308 423441 www aarrowfires com Wood Multifuel Stoves Operating Installation Manual PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE Sherborne Medium Mu...

Страница 2: ...re so confident in the reliability of our product that we offer a Lifetime Guarantee Should you have any questions about our Sherborne range of stoves that are not covered in this manual please contac...

Страница 3: ...12 Extended Burning 12 Over Firing 13 Ash Removal 13 SERVICING Cleaning Annual Maintenance 13 14 Accessories 15 INSTALLATION Page General Precautions 16 Handling 16 Hearth 16 Combustible Materials 16...

Страница 4: ...ED IN THIS APPLIANCE TO USE THESE FUELS WILL INVALIDATE THE APPLIANCE GUARANTEE IF IN DOUBT CONTACT THE SOLID FUEL ASSOCIATION TELEPHONE NUMBER 0800 600 000 www solidfuel co uk THE USE OF SPARE PARTS...

Страница 5: ...roperly installed and operated a house fire may result installation must comply with the Building Regulations and conform to all relevant fire safety standards Aarrow Fires produce a variety of applia...

Страница 6: ...tplate 7 Operating tool 1 8 Rear liner 2 9 Side liners 2 N A Sherborne Medium Wood 2 1 1 5 1 2 2 Sherborne Medium Multifuel N A Sherborne Small Wood 1 5 1 2 2 9 2 1 1 5 1 2 2 Sherborne Large Wood N A...

Страница 7: ...o Centre of Rear Flue Depth from Back to Centre of Flue mm Flue Diameter 127 5 Weight Packed Kg 2 8 Sherborne Medium Wood 9 127 5 Sherborne Medium Multifuel 1 5 6 Sherborne Small Wood 8 395 127 5 2 8...

Страница 8: ...providing under draught to the base of the fire chamber through the controls on the doors of the fires PRIMARY AIR FOR SHERBORNE On the Sherborne primary air enters the appliance through the controls...

Страница 9: ...ld and unlit The door s should be lifted off the hinges so that the below operations can be carried out on a workbench or similar level surface Unscrew the two nuts on the inside of the door securing...

Страница 10: ...hinges Gently tap the two hinge pins in a direction to compensate for the misalignment Fig 9 Refit the door and check to ensure it now sits square to the body if not repeat above steps Fig 9 Adjusting...

Страница 11: ...heat Blazebrite Taybrite Sunbrite Doubles Singles Anthracite Large Nuts and Welsh Dry Steam Coal Large Small Nuts Approval does not cover the use of other fuels either alone or mixed with the suitable...

Страница 12: ...as for manufactured smokeless fuel Leave the air inlet control open about a quarter or less Note The high temperature paint acquires durability by being cured during the initial firings of the applia...

Страница 13: ...se an injury Replace the ash pan and close the fire door CLINKER The formation of clinker suggests that the unit is being over fired Any clinker forming on the grate should be removed when cold OVER F...

Страница 14: ...tainconditions such as burning at a low rate with damp wood or overnight burning the glass may become somewhat blackened To remedy this operate the appliance at a fast rate Alternatively when the stov...

Страница 15: ...ns on add in boilers PAINT Matching aerosol paint to tone in any connecting flues pipes or surrounding metalwork TRACERIES Please note traceries will be available at a later date ADD ON CANOPIES Optio...

Страница 16: ...on HEARTH The fire should be installed to stand on a constructional hearth of non combustible materials not less than 125mm 5 thick conforming to Building Regulations Dimensions of the hearth should p...

Страница 17: ...long centre tab on the back edge rests on the rear liners The shorter turn down tabs against the vertical face Replace the front fuel retainer bars Note Neither the rear firebox liners nor the side f...

Страница 18: ...ng end marked L onto the low section of the comb The upper bar is fitted in a similar manner but with the end marked L inserted in the rear channel and the end marked H seated on the high section of t...

Страница 19: ...lation and are interchangeable These are fitted as follows To fit the interchangeable canopy Fig 10c Remove the front clamps Tilt the canopy as shown in stage 1 Engage the rear clips and pull fully fo...

Страница 20: ...fumes from the stove outlet to the outside air To ensure a good updraught it is important that the flue gases are kept warm and that the flue size suits the stove The termination of the outlet at the...

Страница 21: ...ument J of the Building Regulations for England and Wales is available from The Stationery Bookshops and can also be viewed at the ODPM website at www safety odpm gov uk bregs brads htm Details on the...

Страница 22: ...22 Sherborne Wood Multifuel Stoves INSTALLATION...

Страница 23: ...ULATED FLUES TYPICAL METAL INSULATED CHIMNEY SYSTEM TO BE INSTALLED TO THE CHIMNEY MANUFACTURERS INSTRUCTIONS IN COMPLIANCE WITH BUILDING REGULATIONS AND BS7566 PTS 1 4 A is minimum clearance for non...

Страница 24: ...stems should be carried out by a qualified heating engineer In many cases your supplier will be able to offer advice and assistance Direct Systems Stainless steel boilers either factory fitted or retr...

Страница 25: ...ipe from the expansion tank should be 28mm diameter copper Pipes in unheated spaces must be lagged FINAL CHECK Before handing over the installation to the customer it is strongly recommended that the...

Страница 26: ...s appliances only c If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and state jointing materials used d If an existing chimney has been refurbish...

Страница 27: ...roat Plate 3 Grate Bar Set 4 Hot Plate 5 Operating Tool 6 Ashpan 7 Flue Spigot Part Description Visual Aid not to scale Sherborne Small Wood Sherborne Small Multifuel Sherborne Medium Wood AFS1191 AFS...

Страница 28: ...Glass Clips 13 Hinge kit Comprises 2 Hinges 4 Fixings Per Set 14 Airwash Curved Part Description Visual Aid not to scale Sherborne Small Wood Sherborne Small Multifuel Sherborne Medium Wood AFS1163 AF...

Страница 29: ...skets Clips and Seal 19 Fire Door Locking Assembly 20 Wood Burning Tray 21 Multifuel Upgrade Kit Part Description Visual Aid not to scale SHBS MGRATE AFS1021 L H AFS1238 R H AFS1239 AFS1237 AFS1236 AF...

Страница 30: ...a qualified heating engineer The Manufacturers decision shall be final If your appliance proves to be defective as a result of faulty materials or workmanship during guarantee we will repair or repla...

Страница 31: ...is manual please contact your Aarrow retailer Please keep all repair receipts safely Please ensure you have this manual available when an engineer visits as they will complete the service record chart...

Страница 32: ...I ve checked it and it s O K Assembled by Checked by Date of Purchase Name and address of supplier Please ensure installer completes INSTALLATION CHECK LIST details on page 26 of this manual If an add...

Отзывы: