3 INSTALLATION
Pag. 11 di 37
7.
Screw the two bottom hooks
G
with bolts so that the attachment is safely mounted on the
fork carriage
P
), reaching to the following torques
8.
Insert the forks.
9.
Lubricate the contact parts.
10.
Connect the hydraulic circuit, making sure that the operating pressure of the pipes is higher
than or equal to that indicated on the identification label (
ISO 2328
THREAD
TORQUE
ISO II
M12
90 Nm
ISO III
M14
140 Nm
ISO IV
M16
220 Nm
Tab 3
Picture 4