9
Servicing should only be performed by a Quali
fi
ed Service Technician
SEQUENCE OF OPERATION
Table 1. Sequence Of Operation
OPERATION
TOUCH SCREEN DISPLAY
The control will turn on the water heater pump
(always ON except in Setpoint Adjustment). The
fl
ow switch and/or LWCO must close.
The control turns on power to the damper relay.
The damper proving switch, air pressure switch,
and blocked drain switch must close.
The control starts the prepurge cycle.
The control starts the trial for ignition by energizing
the spark electrode and opening the gas valve.
Tank Temperature
90°F
Operating Setpoint
93°F
Status: Pre-Purge
HELP
DISABLE
A. O. Smith XP
MENU
Tank Temperature
92°F
Operating Setpoint
93°F
S t a t u s : S t a n d b y
HELP
DISABLE
A. O. Smith XP
MENU
Tank Temperature
92°F
Operating Setpoint
93°F
S t a t u s : S t a n d b y
HELP
DISABLE
A. O. Smith XP
MENU
Tank Temperature
90°F
Operating Setpoint
93°F
Status: Ignition
HELP
DISABLE
A. O. Smith XP
MENU
OFF
GAS
O
N