Fig. Example parallel venting system
Refer to the table for the correct pipe dimensions of the C13 or a C33 parallel venting
systems.
Description
Unit
IR-12-160 to
IR 20-200
IR 24-245 to
IR 32-380
Diameter flue discharge/
air inlet
mm/mm
80/80
80/80
Maximum length air inlet
m
50
75
Maximum length flue gas
outlet
m
50
75
L
equivalent
45°-bend
m
1,1
1,1
L
equivalent
90°-bend
m
3,9
3,9
Caution
Always make sure the installation is in compliance with the requirements stated in this
table.
Caution
Use a special adapter box to convert the concentric connection on the water heater to a
parallel connection. This adapter box converts the 80/125 mm to two times 80 mm. This
adapter (0312209) can be ordered at your supplier or wholesaler. The use of a different
adapter box may cause the water heater to malfunction.
Calculate the maximum length of the air inlet and the flue gas outlet seperately:
Sum the lengths of the different pipe sections without bends. Ignore the length of
the adaptor box.
Sum the lengths of the bends. Ignore the bend in the adapter box:
Sum 1,1 m for each 45° bend.
Sum 3,9 m for each 90° bend.
Sum the lengths of the pipe sections and the lengths of the bends to calculate the
overall length of the air inlet and the flue gas outlet.
Adjust the length of the air inlet and/or the flue gas outlet when the overall length
exceeds the maximum length as stated in the table.
c
1.
2.
-
-
3.
4.
0312266_INNOVO_UKUK_V3.0, 2017-02-10
47
Содержание Innovo 12-160
Страница 6: ...6...
Страница 13: ...User part 0312266_INNOVO_UKUK_V3 0 2017 02 10 13...
Страница 14: ...14...
Страница 16: ...16 User part...
Страница 18: ...18 User part...
Страница 24: ...24 User part...
Страница 27: ...Installation Maintenance and Service part 0312266_INNOVO_UKUK_V3 0 2017 02 10 27...
Страница 28: ...28 User part...
Страница 36: ...36 Installation Maintenance and Service part...
Страница 43: ...Fig Venting systems 0312266_INNOVO_UKUK_V3 0 2017 02 10 43...
Страница 58: ...58 Installation Maintenance and Service part...
Страница 70: ...70 Installation Maintenance and Service part...
Страница 83: ...0312266_INNOVO_UKUK_V3 0 2017 02 10 83...
Страница 87: ...13 5 Declaration of conformity 0312266_INNOVO_UKUK_V3 0 2017 02 10 87...
Страница 90: ...90 Installation Maintenance and Service part...
Страница 92: ...92 Installation Maintenance and Service part...