background image

18

2.2.4  Temperature Regulation

The device is continuously under 

water pipe pressure (maximum 8 bar 

(=800 kPa)). Cold water may be fed 

if hot water is being consumed. The 

regulating thermostat switches the feed 

automatically. That means that if the 

thermostat measures a temperature 

lower than the set temperature, then it 

closes the electrical circuit so that an 

electrical current is conducted through 

the heating element. As soon as the 

desired temperature is reached the 

thermostat breaks the contact once 

again. When there are high water 

temperatures, scaling in the device 

occurs. Therefore it is recommended 

to allow the temperature setting to stay 

at 60°C so that less scale is formed. 

A maximum thermostat is installed 

above each regulating thermostat 

which shuts off the current feed to the 

element permanently (locking) at a 

water temperature of 93°C. In order to 

put the element back into operation the 

reset button of the maximum thermostat 

must be pressed in. If the temperature 

climbs above 98°C the temperature and 

pressure valve fitted open for safety 

reasons.

2.3 

Maintenance

The boiler must be tested and cleaned 

by a recognised installation engineer 

at least once per year so that good 

operation can be guaranteed. During 

maintenance the device must never be 

under voltage.

2.3.1  Sacrificial anode

The life of the anodes is determined 

by the quality and the quantity of water 

flowing through the device. It is thus 

recommended that the anodes are 

checked every year.

1.  Close the stop valve in the cold 

water feed pipe.

2.  Open up the nearest hot-water tap 

so that the water pressure in the 

boiler and pipeline drops.

3.  Loosen the anode using a correct 

spanner.

4.  Check the anode and replace if this 

is tarnished above 60%.

5.  Replace the anode in a water-tight 

way.

If it is necessary to replace the anode, 

it must be replaced with one of the 

same type. The type of anode can be 

established via the device type and the 

complete serial number.

2.3.2  Descaling

Scaling depends on the water condition 

and the water demand. Besides, more 

scale deposit will be formed in the device 

at high temperatures than at lower 

temperatures. A temperature setting of 60 

ºC is recommended to ensure low scale 

deposit. Descale using the appropriate 

agents. A descaling instruction is available 

for detailed information.

2.4 

Steps When There is a 

Fault

Warning: 

Always ensure that the device is 

completely free of voltage before the 

door is opened!

Содержание DURA-Power DRE-52

Страница 1: ...HOT WATER STORAGE DEVICES United Kingdom Ireland MODELS DRE 52 DRE 80 DRE 120 INSTALLATION AND USER INSTRUCTIONS...

Страница 2: ...General Terms and Conditions as filed with the Chamber of Commerce For further information see the General Terms and Conditions These can be obtained from us free of charge Although utmost care has be...

Страница 3: ...t of Operation 17 2 2 4 Temperature Regulation 18 2 3 Maintenance 18 2 3 1 Sacrificial anode 18 2 3 2 Descaling 18 2 4 Steps When There is a Fault 18 2 4 1 Water Temperature Not Good 19 2 4 2 Presumed...

Страница 4: ...el plate which has a glass lined coating on the inside The tank is also provided with two sacrificial anodes to give extra protection against corrosion A thick CFC free polyurethane insulation layer c...

Страница 5: ...5 Fig 1 regulation and safety 1 2 Regulation and Safety For clarification see the diagram below the image is an extract from the electrical diagram further on...

Страница 6: ...to the regulating thermostat 9 The element 10 is fed from the regulating thermostat During normal operation the regulating thermostat 9 switches the element 10 on and off If a temperature of above 93...

Страница 7: ...e exposure height is too small the contact will no longer connect even if the float is completely above it In this case the device will not come into operation If the exposure height is set lower than...

Страница 8: ...and 1 5 Ohms Screw the float switch back into the tank and place it vertically Check the exposure height Close the door and connect the feed voltage The safety relays must not come in The tautening a...

Страница 9: ...meter of boiler 560 640 750 E Depth 690 790 910 M Height of drain valve 125 125 125 R Height cold water supply 125 125 125 S Height T P connection 1230 1335 1380 1 Cold water connection 1 14NPT 1 14NP...

Страница 10: ...uous 40 C litres hour 241 258 482 516 963 1032 Weight kg 73 73 73 Type DRE 80 9 DRE 80 18 DRE 80 36 DRE 80 54 Tank capacity litres 300 300 300 300 Number of elements 3 3 6 9 Power 380V 3F kW 7 6 15 2...

Страница 11: ...ing time up to 40C 400 414V min 112 105 56 52 28 26 19 17 Tap capacity 1st hour 60 C 400 414V litres 569 579 707 726 981 1020 1256 1314 Tap capacity continuous 60 C 400 414V litres hour 145 155 289 31...

Страница 12: ...the temperature increase will drip into the drainage via the overflow of the inlet combination This is a normal occurrence The dripping must never be obstructed and or blocked The drain must remain fr...

Страница 13: ...elow Diagram A Diagram B Diagram C Electrical diagram for 3 phase Electrical diagram for 3 phase Electrical diagram for 3 phase connection connection with 3 elements connection with 6 elements with ni...

Страница 14: ...connection B Fuses C Relay D Fuse E Transformer F Safety relay G Float switch H Maximum thermostat K Regulation thermostat L Electrical heating element X1 Terminal block 1 Black Zwart Schartz Noir 2...

Страница 15: ...nsformer F Safety relay G Float switch H Maximum thermostat K Regulation thermostat L Electrical heating element X1 Terminal block 1 Black Zwart Schartz Noir 2 Red Rood Rot Rouge 3 Blue Blauw Blau Ble...

Страница 16: ...connection B Fuses C Relay D Fuse E Transformer F Safety relay G Float switch H Maximum thermostat K Regulation thermostat L Electrical heating element X1 Terminal block 1 Black Zwart Schartz Noir 2...

Страница 17: ...et the desired temperature on the regulating thermostat see table When leaving the factory the temperature is set at 60 C Temperature in F Temperature in C 120 49 130 54 140 60 150 66 160 71 170 77 18...

Страница 18: ...d cleaned by a recognised installation engineer at least once per year so that good operation can be guaranteed During maintenance the device must never be under voltage 2 3 1 Sacrificial anode The li...

Страница 19: ...ximum thermostats which break the circuit when the water temperature is too high 93 C These maximum thermostats can only be reset again once the temperature has dropped 20 C Then the regulating thermo...

Страница 20: ...se Solution Insufficient or no hot water Temperature set too low Set regulating thermostats higher Maximum thermostats break the circuit Press in reset button Connector is not seated in stop contact m...

Страница 21: ...1 Check whether the device is filled with water 2 Switch the mains switch on for a fixed connection or place the connector in the stop contact 3 1 3 Use The device is under water pipe pressure maximu...

Страница 22: ...t hot water drainage point for ventilating the tank Take care that the feed pipe and inlet combination cannot freeze Drain the feed pipe as necessary and check whether all other pipes are empty 3 2 Ma...

Страница 23: ...ccording to the installation instructions of A O Smith for the specific model as well as according to the local and national installation and building regulations instructions and rules b that the boi...

Страница 24: ...or any parts thereof ex the Veldhoven warehouse Any costs involved with transport labour installation or any other capacity connected to the replacement cannot be charged to A O Smith 4 6 Claims A cl...

Страница 25: ...25...

Страница 26: ...0310 145_R2...

Отзывы: