2.  FOR THE INSTALLER

2.1 

Installation procedures

The device may only be placed in a space 

if this meets the valid national and local 

regulations. This space must be frost free 

or protected against frost.

The device may not be installed in damp 

or wet areas. The insulation classification 

of the device is: IP X1

2.1.1  General Installation

The installation shall be carried out by 

a recognised installation engineer in 

accordance with the generally and locally 

applicable regulations for electrical and 

water companies.

2.1.2  Water Connections

The maximum permissible operating 

pressure of the device is 8 bar (= 800 kPa).

On the cold water side the device must 

have a shut off valve and approved inlet 

combination. The inlet combination must 

be fitted as closely as possible on the 

device in accordance with the regulations. 

The inlet combination must be allowed 

to work regularly with the aim of avoiding 

a blockage as a consequence of scale. 

The drainage pipe of the inlet combination 

must be fitted in such a way that it 

constantly slopes upwards. A stop valve 

or non-return valve must never be fitted 

between the inlet combination and the 

device.

During heating of the device, expansion 

water (as a result of the temperature 

increase) will drip into the drainage via the 

overflow of the inlet combination. This is 

a normal occurrence. The dripping must 

never be obstructed and/or blocked. The 

drain must remain free at all times with 

regard to the surroundings.

The device must be provided with a 

temperature and pressure protection 

mechanism (T&P valve). This is supplied 

with the device. The overflow of the T&P 

valve must be connected onto the drain.

When there is a water pipe pressure 

greater than 8 bar (= 800 kPa) an 

approved reduction device must also be 

fitted.. When replacing an old device with 

a new one the inlet combination must also 

be renewed.

2.1.3  Electrical  Connection

The electrical connection may only be 

made by a recognised installation engineer 

in accordance with the valid regulations of 

the energy company. This device must be 

provided with an all pole mains switch with 

a contact separation of at least 3 mm if a 

fixed connection is used.

This appliance has been subjected in 

the factory to a complete earthing-, high 

voltage- and funtional test.

As a result of transport and/or use of the 

appliance, screwed wire connections 

may loosen from vibration.

For this reason, before the appliance 

is put into operation, all screwed wire 

connections must be checked to see if 

they are secure. 

Also during inspection and maintenance 

activities, all wire connections must be 

checked.

Warning: The device must be earthed.

Содержание DURA-Power DRE-52

Страница 1: ...HOT WATER STORAGE DEVICES United Kingdom Ireland MODELS DRE 52 DRE 80 DRE 120 INSTALLATION AND USER INSTRUCTIONS...

Страница 2: ...General Terms and Conditions as filed with the Chamber of Commerce For further information see the General Terms and Conditions These can be obtained from us free of charge Although utmost care has be...

Страница 3: ...t of Operation 17 2 2 4 Temperature Regulation 18 2 3 Maintenance 18 2 3 1 Sacrificial anode 18 2 3 2 Descaling 18 2 4 Steps When There is a Fault 18 2 4 1 Water Temperature Not Good 19 2 4 2 Presumed...

Страница 4: ...el plate which has a glass lined coating on the inside The tank is also provided with two sacrificial anodes to give extra protection against corrosion A thick CFC free polyurethane insulation layer c...

Страница 5: ...5 Fig 1 regulation and safety 1 2 Regulation and Safety For clarification see the diagram below the image is an extract from the electrical diagram further on...

Страница 6: ...to the regulating thermostat 9 The element 10 is fed from the regulating thermostat During normal operation the regulating thermostat 9 switches the element 10 on and off If a temperature of above 93...

Страница 7: ...e exposure height is too small the contact will no longer connect even if the float is completely above it In this case the device will not come into operation If the exposure height is set lower than...

Страница 8: ...and 1 5 Ohms Screw the float switch back into the tank and place it vertically Check the exposure height Close the door and connect the feed voltage The safety relays must not come in The tautening a...

Страница 9: ...meter of boiler 560 640 750 E Depth 690 790 910 M Height of drain valve 125 125 125 R Height cold water supply 125 125 125 S Height T P connection 1230 1335 1380 1 Cold water connection 1 14NPT 1 14NP...

Страница 10: ...uous 40 C litres hour 241 258 482 516 963 1032 Weight kg 73 73 73 Type DRE 80 9 DRE 80 18 DRE 80 36 DRE 80 54 Tank capacity litres 300 300 300 300 Number of elements 3 3 6 9 Power 380V 3F kW 7 6 15 2...

Страница 11: ...ing time up to 40C 400 414V min 112 105 56 52 28 26 19 17 Tap capacity 1st hour 60 C 400 414V litres 569 579 707 726 981 1020 1256 1314 Tap capacity continuous 60 C 400 414V litres hour 145 155 289 31...

Страница 12: ...the temperature increase will drip into the drainage via the overflow of the inlet combination This is a normal occurrence The dripping must never be obstructed and or blocked The drain must remain fr...

Страница 13: ...elow Diagram A Diagram B Diagram C Electrical diagram for 3 phase Electrical diagram for 3 phase Electrical diagram for 3 phase connection connection with 3 elements connection with 6 elements with ni...

Страница 14: ...connection B Fuses C Relay D Fuse E Transformer F Safety relay G Float switch H Maximum thermostat K Regulation thermostat L Electrical heating element X1 Terminal block 1 Black Zwart Schartz Noir 2...

Страница 15: ...nsformer F Safety relay G Float switch H Maximum thermostat K Regulation thermostat L Electrical heating element X1 Terminal block 1 Black Zwart Schartz Noir 2 Red Rood Rot Rouge 3 Blue Blauw Blau Ble...

Страница 16: ...connection B Fuses C Relay D Fuse E Transformer F Safety relay G Float switch H Maximum thermostat K Regulation thermostat L Electrical heating element X1 Terminal block 1 Black Zwart Schartz Noir 2...

Страница 17: ...et the desired temperature on the regulating thermostat see table When leaving the factory the temperature is set at 60 C Temperature in F Temperature in C 120 49 130 54 140 60 150 66 160 71 170 77 18...

Страница 18: ...d cleaned by a recognised installation engineer at least once per year so that good operation can be guaranteed During maintenance the device must never be under voltage 2 3 1 Sacrificial anode The li...

Страница 19: ...ximum thermostats which break the circuit when the water temperature is too high 93 C These maximum thermostats can only be reset again once the temperature has dropped 20 C Then the regulating thermo...

Страница 20: ...se Solution Insufficient or no hot water Temperature set too low Set regulating thermostats higher Maximum thermostats break the circuit Press in reset button Connector is not seated in stop contact m...

Страница 21: ...1 Check whether the device is filled with water 2 Switch the mains switch on for a fixed connection or place the connector in the stop contact 3 1 3 Use The device is under water pipe pressure maximu...

Страница 22: ...t hot water drainage point for ventilating the tank Take care that the feed pipe and inlet combination cannot freeze Drain the feed pipe as necessary and check whether all other pipes are empty 3 2 Ma...

Страница 23: ...ccording to the installation instructions of A O Smith for the specific model as well as according to the local and national installation and building regulations instructions and rules b that the boi...

Страница 24: ...or any parts thereof ex the Veldhoven warehouse Any costs involved with transport labour installation or any other capacity connected to the replacement cannot be charged to A O Smith 4 6 Claims A cl...

Страница 25: ...25...

Страница 26: ...0310 145_R2...

Отзывы: