Filling
48
Instruction manual BFC
5
gis
5.1
Filling unvented
installations
To fill the water heater, proceed as follows:
1. Open the stop valve (11) in the hot water pipe and, if present, the stop valves
(4) for the circulation pump (6).
2. Close the drain valve (9).
3. Open the nearest hot water draw-off point (14).
4. Open the stop valve (4) on the cold water side (A) so that cold water flows
into the water heater.
5. Completely fill the water heater. When a full water jet flows from the nearest
draw-off point, the water heater is full.
6. Bleed the entire installation of air, for example by opening all draw-off points.
7. The water heater is now under water supply pressure. There should now be
no water coming out of the inlet combination expansion valve or (if used) out
of the T&P valve (3). If there is, the cause might be:
-
The water supply pressure is greater than the specified
value (3.4.2 "General and electrical specifications").
Rectify this by fitting a pressure reducing valve (1).
-
The expansion valve in the protected cold supply set-up is defective or
incorrectly fitted.
5.2
Filling vented
installations
To fill the water heater, proceed as follows:
1. Open the stop valve (11) in the hot water pipe and, if present, the stop valves
(4) for the circulation pump (6).
2. Close the drain valve (9).
3. Open the nearest hot water draw-off point (14).
4. Open the stop valve (4) on the cold water side (A) so that cold water flows
into the water heater.
5. Completely fill the water heater. When a full water jet flows from the nearest
draw-off point, the water heater is full.
6. Bleed the entire installation of air, for example by opening all draw-off points.
7. The water heater is now under water supply pressure. There should now be
no water coming out of the inlet combination expansion valve or (if used) out
of the T&P valve (3). If there is, the cause might be:
-
The water supply pressure is greater than the specified
value (3.4.2 "General and electrical specifications").
Rectify this by fitting a pressure reducing valve (1).
-
The expansion valve in the protected cold supply set-up is defective or
incorrectly fitted.
Содержание 120 through 250 Series
Страница 4: ...E2 ...
Страница 6: ...4 Instruction manual BFC gis ...
Страница 10: ...Contents 8 Instruction manual BFC ...
Страница 31: ...Instruction manual BFC 29 is Installation types IMD 0789 R0 C43 C13 C53 B23 C33 ...
Страница 48: ...Conversion to a different gas category 46 Instruction manual BFC 4 is ...
Страница 58: ...Status of the water heater 56 Instruction manual BFC 8 gis ...
Страница 62: ...Shutting down 60 Instruction manual BFC 10 gis ...
Страница 74: ...Service program 72 Instruction manual BFC 12 is ...
Страница 88: ...Service interval 86 Instruction manual BFC 14 is ...
Страница 97: ...Instruction manual BFC 95 is ...
Страница 100: ...Appendices 98 Instruction manual BFC 17 is 17 4 Declaration of conformity Declaration of conformity ...
Страница 102: ...Instruction manual BFC 100 ...