
User manual
Before installation, confirm that the work environment meet the installation require,
including the power needs and abundant space. Whether it is close to the connection equipment and
other equipments are prepared or not.
1. Avoid in the sunshine, keep away from the heat fountainhead or the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3. Examine whether the cables be seemly or not (less than 100m) according to reasonable
scheme.
4. Screw, nut, tool provide by yourself.
5. Power: redundant 12-48VDC power input
6. Environment
:
working temperature -40
~
85
℃
Relative humidity 5%
~
95%
DIN-Rail Installation
In order to use in industrial environments expediently, IES7110-3GS adopts 35mm DIN-
Rail installation, the installation steps as follows:
1.Examine the DIN-Rail attachment
2.Examine DIN Rail is firm or not and the position is suitable or not.
3.Insert the top of the DIN-Rail into the slot just below the stiff metal spring.
4.The DIN-Rail attachment unit will snap into place as shown below.