20
7-INSTALLATION AND SET-UP
(continued)
800rf-NA
2012 March
7.6 Pneumatic & Control Board Connections
(continued)
- Connect an air tube to the ON/OFF valve and
attach it with a strap.
Minimum inside diameter of the tube 10mm;
air pressure 6 BAR.
- Give air to the machine with the ON/OFF valve
(Figure 7-15).
Position the control board near the machine. Feeder
cables: Connect the cable with multipolar connectors
from the machine and from conveyor to the control
board
(Figure 7-16).
Front and back junction boxes connections (1, 2 -
Figure 7-17 & 7-18
):
2
1
Figure 7-15
Figure 7-16
Figure 7-18
Figure 7-17
Содержание 3M-Matic 800rf
Страница 4: ...THIS PAGE IS BLANK ...
Страница 6: ...THIS PAGE IS BLANK ...
Страница 8: ...8 THIS PAGE IS BLANK ...
Страница 10: ...THIS PAGE IS BLANK ...
Страница 58: ...46 THIS PAGE IS BLANK ...
Страница 60: ...48 THIS PAGE IS BLANK ...
Страница 62: ...50 THIS PAGE IS BLANK ...
Страница 64: ...52 16 TECHNICAL DIAGRAMS 16 1 Electric Diagram Page 2A see next Page 2B 2012 March 800rf NA 4 3B 4 4C ...
Страница 68: ...56 THIS PAGE IS BLANK ...
Страница 70: ...58 THIS PAGE IS BLANK ...
Страница 74: ...62 Figure 10440 800rf 2012 0DUFK 800rf NA ...
Страница 76: ...64 800rf 2012 0DUFK 800rf NA 12 13 11 8 9 7 1 2 3 6 10 4 5 Figure 15072 1 6 7 9 2 4 5 3 8 10 13 12 11 ...
Страница 110: ...98 THIS PAGE IS BLANK ...
Страница 120: ...108 800rf 800rf NA 2012 March Figure 15087 11 10 12 7 2 3 3 1 3 6 6 5 5 8 4 9 13 3 ...
Страница 122: ...THIS PAGE IS BLANK ...