10
3D Systems, Inc
.
10. Using wire cutters, carefully cut the six (6) zip ties securing the delivery
tube nuts to the inner floor.
CAUTION: Remove all remnants of the wire ties. Any plastic
that may drop into the components can cause damage if left
there.
11.
Route the delivery tube nuts to the rounded openings in the inner floor
and push them through.
12.
Carefully tilt the inner floor at an angle and pull it out of the printer.
CAUTION: Ensure the heater assembly is properly supported
as you tilt the floor. Place the heater assembly on the printer
outer floor away from other components.
Top
Front
Bottom