background image

The Baseline Dual Speed Hub is supplied with two mounting 
brackets and four screws. These are used for rack mounting the unit. 
When mounting the unit, you should take note of the guidelines 
given in “Positioning the Baseline Dual Speed Hub”on page 3.

The Baseline Dual Speed Hub is 1U high and will fit a standard 
19-inch rack.

CAUTION: 

Disconnect all cables from the unit before 

continuing. Remove the self-adhesive pads from the 
underside of unit, if already fitted.

To rack mount the unit:

1

Place the unit the right way up on a hard, flat surface with the 
front facing towards you.

2

Locate a mounting bracket over the mounting holes on one 
side of the unit, as shown in the diagram.

3

Insert the two screws supplied in the mounting kit and fully 
tighten with a suitable screwdriver.

4

Repeat the two previous steps for the other side of the unit.

5

Insert the unit into the 19-in. rack and secure with suitable 
screws (not provided).

6

Reconnect all cables.

Refer to the information about LEDs given earlier in this guide to see 
if the problem can be identified and rectified. If the problem persists 
and the Baseline Dual Speed Hub still does not operate successfully, 
contact your supplier with the following information before 
returning the unit:

Product number and serial number
(printed on a label on the rear of the unit)

A brief description of the fault

When returning any equipment to your supplier ensure that the 
equipment is packed suitably for transit.

Some older NIC (network interface card) cards were 
developed before the standardization of the 
auto-negotiation protocol. These may cause the Baseline 
Dual Speed Hub to sense the speed of the network 
incorrectly. We strongly recommend that you install the 
latest versions of the NIC drivers before connecting your 
network. 3Com NIC card drivers dated before 23/03/95 
should be updated from the 3Com website.

The SuperStack

®

 II Baseline Dual Speed Hub has been designed and 

certified to the following standards:

Environmental

Physical

Electrical

M

OUNTING

 K

IT

 I

NSTRUCTIONS

P

ROBLEM

 S

OLVING

T

ECHNICAL

 I

NFORMATION

Functional

ISO/IEC 8802-3, IEEE 802.3, IEEE 802.3u, IEEE 
802.1D

Safety

UL 1950, EN 60950, CSA 22.2#950, IEC 60950

EMC

EN 55022 Class B*, VCCI Class B*, AS/NZS3548 
Class B*, FCC Part 15 Class A, ICES-003 Class A

* Category 5 screened cables must be used to ensure complete 
compliance with the Class B requirements of this standard. 
The use of unscreened cables (Category 3 or 5 for 10BASE-T 
ports or Category 5 for 100BASE-TX ports) complies with 
Class A requirements.

Immunity

EN 50082-1 (IEC801 Parts 2–5)

Operating Temperature

0–50°C (32–122°F)

Humidity

0–95% (non-condensing)

Width

440 mm (17.3 in.)

Depth

173 mm (6.8 in.)

Height

44 mm (1.7 in.) or 1U

Weight

3C16592A: 2.22 kg (4.90 lb) 
3C16593A: 2.10 kg (4.63 lb)

Mounting

Free standing, or 19-in. rack mounted using the 
mounting kit supplied

Power Inlet

IEC 320

AC Line Frequency

50/60 Hz

Power Consumption

3C16592A: 25 VA 
3C16593A: 42 VA

Power Dissipation

3C16592A: 86 BTU/hr
3C16593A: 142 BTU/hr

Input Voltage

100–240 VAC

Current Rating

3C16592A: 1.0 A (maximum)
3C16593A: 1.0 A (maximum)

4

Содержание SuperStack II 3C16592A

Страница 1: ...ual Speed Hub is suitable for office use where it can be free standing or rack mounted in a wiring closet or equipment room The hub can be powered either from the AC mains supply or through an optiona...

Страница 2: ...length of cable between the Baseline Dual Speed Hub and an attached device must not exceed 100 m 328 ft If you are connecting multiple hubs in series ensure that there are no more than four 10 Mbps h...

Страница 3: ...you provide a minimum of 25 mm 1 in clearance To prolong the operational life of your units Never stack units more than six high if free standing and ensure that cables are supported so that they do n...

Страница 4: ...d suitably for transit Some older NIC network interface card cards were developed before the standardization of the auto negotiation protocol These may cause the Baseline Dual Speed Hub to sense the s...

Страница 5: ...t direct la terre masse Cordon lectrique Il doit tre agr dans le pays d utilisation Bitte unbedingt vor dem Einbauen des Baseline Dual Speed Hub Einheit die folgenden Sicherheitsanweisungen durchlesen...

Страница 6: ...vides a purchase order number credit card number or other method of payment acceptable to 3Com to be used if 3Com needs to charge Customer for the replacement as explained below The replacement produc...

Страница 7: ...5 4 In order to meet FCC emissions limits this equipment must be used only with cables which comply with IEEE 802 3 CSA Statement This Class A digital apparatus meets all requirements of the Canadian...

Страница 8: ...tion on the part of 3Com Technologies to provide notification of such revision or change 3Com Technologies provides this documentation without warranty of any kind either implied or expressed includin...

Отзывы: