The Power-up Sequence
23
Powering-up the Switch 4950
23
Checking for Correct Operation of LEDs
23
Connecting a Redundant Power System
23
Choosing the Correct 10/100/1000BASE-T Cables
24
Choosing the correct Fiber cables
25
GBIC Operation
25
Approved GBIC Transceivers
25
Inserting a GBIC Transceiver
26
3
S
ETTING
U
P
FOR
M
ANAGEMENT
Logging in as a Default User
30
Changing Default Passwords
30
Introduction to Setting Up
31
Initial Switch Setup
31
Pre-requisites
31
Connecting to the Console Port
32
Setting up IP Information via the Console Port
33
Methods of Managing a Switch
34
Command Line Interface Management
34
Web Interface Management
35
SNMP Management
35
Setting Up Command Line Interface Management
36
CLI Management via the Console Port
36
CLI Management over the Network
36
Setting Up Web Interface Management
37
Pre-requisites
37
Web Management Over the Network
37
Setting Up SNMP Management
38
Pre-requisites
38
4
P
ROBLEM
S
OLVING
Solving Problems Indicated by LEDs
40
Solving Hardware Problems
41
Solving Communication Problems
42
Содержание SuperStack 3 4950
Страница 6: ......
Страница 18: ...18 CHAPTER 1 INTRODUCING THE SUPERSTACK 3 SWITCH 4950 ...
Страница 28: ...28 CHAPTER 2 INSTALLING THE SWITCH ...
Страница 44: ...44 CHAPTER 4 PROBLEM SOLVING ...
Страница 54: ...54 APPENDIX A SAFETY INFORMATION ...
Страница 55: ...B PIN OUTS Null Modem Cable 9 pin to RS 232 25 pin PC AT Serial Cable 9 pin to 9 pin ...
Страница 58: ...58 APPENDIX B PIN OUTS ...