background image

1

-4

C

HAPTER

 1: I

NTRODUCTION

VORSICHT

: Zur Verhütung von Schadën durch ESD:

Vergewissern Sie sich, daß Sie richtig geerdet sind. Benutzen Sie ein 
Fußband und eine geerdete Matte oder tragen Sie ein geerdetes 
Handgelenkband mit gutem Hautkontakt.

Lassen Sie das Modul bis zur Installation in der Anti-Statik-Tasche.

32MB Memory 
Upgrade SIMM

This section explains how to handle and identify the 32MB Memory 
Upgrade SIMM.

Inspecting the 32MB

SIMM

Before touching the memory SIMM make sure that you are using 
the ESD wrist strap and that it is connected as described previously. 
The SIMM should only be held from the sides. Carefully remove the 
SIMM from the antistatic bag and inspect it for damages. If the 
SIMM appears to be damaged, return it to the antistatic bag and 
contact your 3Com Representitive.

Identifying the

32MB Memory

Upgrade SIMM

To accurately identify the product as 32MB check for a label with 
the inscription “32MB” on the upper component side of the SIMM 
(Figure 1-2).  Make sure the SIMM has the 32MB label.

  

32MB Memory SIMM

32MB label

Содержание COREBUILDER 7000HD

Страница 1: ... http www 3com com 32 MB MEMORY UPGRADE FOR THE COREBUILDER 7000HD SWITCH INSTALLATION GUIDE Part No DIA37OU 1AAA02 Published November 1998 ...

Страница 2: ...the software described herein are provided to you subject to the following All technical data and computer software are commercial in nature and developed solely at private expense Software is delivered as Commercial Computer Software as defined in DFARS 252 227 7014 June 1995 or as a commercial item as defined in FAR 2 101 a and as such is provided with only such rights as are provided in 3Com s ...

Страница 3: ...nen für elektrostatische Entladungen 1 3 32MB Memory Upgrade SIMM 1 4 Inspecting the 32MB SIMM 1 4 Identifying the 32MB Memory Upgrade SIMM 1 4 2 32MB MEMORY UPGRADE INSTALLATION ON THE COREBUILDER 7000HD SWITCH MODULE 32Mb Memory Upgrade Steps 2 1 Step 1 Removing the CoreBuilder 7000HD Switch Module from the Chassis 2 1 Step 2 Removing the 16MB Memory SIMM 2 5 Step 3 Inserting the 32MB Memory SIM...

Страница 4: ...iv ...

Страница 5: ...oreBuilder networking equipment is necessary to understand this manual Organization The 32MB Memory Upgrade for the CoreBuilder 7000HD Switch Installation Guide is organized so that the information needed can be accessed directly The parts of the document are described below Chapter 1 Introduction This chapter presents the Memory Upgrade SIMM and assembly kit combined as 3C37041 at a glance descri...

Страница 6: ...u need Notice Icons Icon Type Description Information Note Information notes call attention to important features or instructions Caution Cautions alert you to personal safety risk system damage or loss of data Warning Warnings alert you to the risk of severe personal injury CoreBuilder 7000 7000HD Documentation Road Map If you want to Read Get an overview of the CoreBuilder 7000 ATM switch includ...

Страница 7: ...r 7000 ATM switch User Guide Find out what type of configuration tasks you can perform on the CoreBuilder 7000 ATM switch User Guide Perform configuration or administration tasks using the Administration Console Installation and Startup Guide User Guide Get assistance Technical Support Appendix in any guide CoreBuilder 7000 7000HD Documentation Road Map continued If you want to Read ...

Страница 8: ...iv ABOUT THIS GUIDE ...

Страница 9: ...e version 4 0 automatically recognizes the larger memory and immediately utilizes it for additional call capacity Included with this kit is an ESD wrist strap to prevent damage to the SIMM and to the switch from electrostatic emmisions Installation Upgrade KIt In order to help you 3Com supplies all the tools necessary for the upgrade in the installation upgrade kit The installation upgrade kit sup...

Страница 10: ... failures CAUTION To prevent ESD related damage Always wear the ESD wrist strap supplied ensuring that the strap is firmly secured to your wrist The other end should be connected to a grounded surface Connect the clip on the end of the wrist strap to a grounding point on an anti static table or to a grounded distribution rack Keep the 32MB Memory SIMM in its antistatic shielded bag until you are r...

Страница 11: ...ues Assurez vous d être bien branché à la terre Utilisez un sous pied et un tapis relié à la terre ou portez un bracelet mis à la terre et veillez à ce que le contact dermique soit bon Conservez le module dans un sac antistatique jusqu à son installation Sicherheitsinformationen für elektrostatische Entladungen Elektrostatische Entladungen ESD können einzelne Baugruppen oder das gesamte Modul besc...

Страница 12: ...ting the 32MB SIMM Before touching the memory SIMM make sure that you are using the ESD wrist strap and that it is connected as described previously The SIMM should only be held from the sides Carefully remove the SIMM from the antistatic bag and inspect it for damages If the SIMM appears to be damaged return it to the antistatic bag and contact your 3Com Representitive Identifying the 32MB Memory...

Страница 13: ...re properly connected to grounding equipment as described in Safety Precautions on page 1 2 Disconnect the cables from the module s ports Ensure that there is a record of where the cables are attached so that you can correctly re connect them to the module when finished With the 1 flathead screwdriver supplied loosen the two captive screws located on the far left and right of the module near the e...

Страница 14: ...p the ejector handles of the card and push them outward Figure 2 2 This ejects the card slightly You may have to apply considerable force to the handles in order to eject the card You will hear a click to indicate that the connections have separated and the card will slide slightly forward out of the CoreBuilder chassis ...

Страница 15: ...at in the holes and do not catch on the front panel Keeping the ejectors in the openmost position remove the switch module by sliding it outwards If you experience difficulty in removing the switch insert the special key in the space above the switch module on the right side near the black handle of the power supply Figure 2 3 ...

Страница 16: ...MORY UPGRADE INSTALLATION ON THE COREBUILDER 7000HD SWITCH MODULE Inserting the Special Key Raise the key and slide the switch module out Figure 2 4 Sliding the Switch Module Out Using both hands pull the switch module out ...

Страница 17: ...ponents facing up Step 2 Removing the 16MB Memory SIMM The memory SIMM is located on the lower left corner of the module when the front panel is facing you Figure 2 5 On the top of the memory SIMM there are two metal spring clips one on each side of the SIMM that hold the SIMM in place Figure 2 6 Position of 16MB SIMM in CoreBuilder 7000HD Switch Module Front View 16MB Memory SIMM Front Panel ...

Страница 18: ...ide View of the Memory SIMM With your thumbs push the clips outward to release the SIMM When pressed the SIMM releases and rises slightly Figure 2 7 Removing the 16MB SIMM With your thumb and index finger remove the SIMM from the connector at a 45 degree angle Figure 2 8 Metal Spring Clip ...

Страница 19: ...hat the front panel of the switch module is facing you and that the switch is on proper grounding material or an antistatic bag Make sure that you hold the SIMM as follows The cutout on the gold connector edge is facing the front panel Figure 1 2 The SIMM is held at a 45 degree angle Insert the SIMM with its gold connector into the black connector at a 45 degree angle Figure 2 9 ...

Страница 20: ...INSTALLATION ON THE COREBUILDER 7000HD SWITCH MODULE Inserting the 32MB Memory SIMM With one or two fingers not on the chips gently press down A click is heard when the SIMM is in place Figure 2 10 Pushing the 32MB SIMM in Place Cutout ...

Страница 21: ...the chassis You may have to apply considerable pressure to the handles An audible click indicates that the connectors have engaged Verify that the card has been properly installed by observing its LEDs Tighten the module s securing screws Verifying 32MB Memory Upgrade To verify that the switch module s memory has been upgraded successfully follow the steps below Reconnect all the cables to the swi...

Страница 22: ...2 10 CHAPTER 2 32MB MEMORY UPGRADE INSTALLATION ON THE COREBUILDER 7000HD SWITCH MODULE ...

Страница 23: ...000HD i ii User Guide ii CoreBuilder 7000HD User Guide ii D documentation related ii E ejector handles 2 2 G guide conventions ii organization i scope i H how to read documentation ii I icons notice ii installation memory upgrade 2 1 K key 2 3 L LAN Emulation iii LMA Logging in 2 9 M memory chipset i memory SIMM removing 2 5 memory upgrade installing 2 1 verifying 2 9 memory upgrade installation g...

Страница 24: ...2 INDEX V verifying memory upgrade 2 9 W who should use this guide i ...

Отзывы: