10
11
2VV.
Creating innovative solutions for you and your business since 1995.
ver.1 31-05-21
• The support of the unit should be sufficiently strong, it
must correspond to the unit’s weight!
• Given its weight, lifting equipment will be required
when installing the unit (e.g. a forklift) or at least two
more people to hold it.
Place the unit horizontally and then tilt it 3° to drain the
condensate.
When installing on the wall, place the unit horizontally.
The unit can only be installed in a position where the con
-
densate drain is pointing downwards.
6. INSTALLATION
Drill the holes in the ceiling / on the wall, check the
strength of the material and fasten the unit to the side
brackets with the ZTZ-M8/1,0 threaded rods.
ATTENTION!
0
Underfloor installation
Installation on the wall
0
mm
0
90°