background image

Portable N

2

O Source Manual  Rev. B-2 

 

 

Figure 2.  Diagram of the Portable N

2

O Source mounted on a Model 211. 

 
 

Model 408:  If you have a newer instrument that has a regulator mount on the left 
side  panel,  proceed  to  Step  2.    Otherwise,  a  new  left  side  panel  with  the  correct 
mounting holes will need to be requested from 2B Tech and installed.  Remove all 
of the screws around the enclosure front and back panels, including the screws on 
the front bezel.  Remove the left panel while keeping the top and bottom panels of 
the instrument from sliding.  Install the regulator mount on the left panel using the 
two #10 pan head screws and split locking washer supplied with the Portable N

2

Source.  Install the left panel on the instrument and install all of the screws at the 
front and back panels of the enclosure. 

 

 

Figure 3.  Diagram of the Portable N

2

O Source mounted on a Model 408. 

 

2)  Loosen  the  single  #10  socket  cap  screw  (see  Figure  1)  to  allow  the  regulator 

assembly to slide into the mount. 
 

3)  Slide the regulator assembly into the mount from the top.  Position the regulator 

assembly so that the mount is centered on the top part of the piercing device, 
not the black cartridge cup (see Figure 4).  Tighten the #10 socket cap screw to 
secure the assembly in the mount. 

 

Содержание 211

Страница 1: ...e N2O Source For use with the Model 211 Scrubberless Ozone Monitor and Model 408 NO Calibration Source Copyright 2017 2B Technologies Inc All rights reserved Technical Support www twobtech com techsup...

Страница 2: ...icological effects of N2O other than asphyxiation at extremely highly concentrations due to exclusion of oxygen N2O is not itself combustible but it strongly supports combustion of organic materials a...

Страница 3: ...to the back panel is a good idea to help ensure that the connections are remade correctly after installation of a new back panel Transfer all the components on the old back panel to the new one Mount...

Страница 4: ...from sliding Install the regulator mount on the left panel using the two 10 pan head screws and split locking washer supplied with the Portable N2O Source Install the left panel on the instrument and...

Страница 5: ...9 or email us at techsupport twobtech com Shipping Box Contents Open the shipping box and verify that it contains the following 1 Piercing device with integrated pressure regulator and removable inser...

Страница 6: ...ght 2 Close the on off valve by rotating the knob clockwise until you feel the knob stop turning 3 Unscrew the cartridge cup from the assembly Do not completely remove the cartridge cup until you are...

Страница 7: ...ob turned completely clockwise 2 To use the Portable N2O Source check that there is tubing connecting the source to the instrument and then open the on off valve by turning the knob completely counter...

Отзывы: