background image

timeSWITCH 150

GB, IE, ES, PT

Operating and installation manual

Summary of Contents for timeSWITCH 150

Page 1: ...timeSWITCH 150 GB IE ES PT Operating and installation manual...

Page 2: ......

Page 3: ...For the owner and heating engineer Operating and installation manual timeSWITCH 150 24 hour timer GB IE...

Page 4: ...5 Operating instructions 5 1 Description of the device 5 2 Operation 8 2 1 Selecting the operating mode 8 2 2 Setting the timer 8 2 3 Setting slides 9 2 4 Setting the heating program 9 2 5 Weekend mod...

Page 5: ...d installation manual Contents GB IE 5 Safety instructions and regula tions 13 5 1 Safety instructions 13 5 2 Regulations 14 6 Installation 14 7 Start up 16 8 Handing over to the owner 17 9 Customer s...

Page 6: ...ating and installation manual We accept no liability for any damage caused by failure to observe these instructions Other valid documents Operating and installation manuals for all system components S...

Page 7: ...system so that it is available whenever it is required Safety The timer must be installed by an approved specialist who is responsible for the observance of the relevant stand ards and regulations Op...

Page 8: ...manual 1 Description of the device Overview of the device 12 3 6 9 1 5 2 3a 4 3b Fig 1 1 Overview of the device Key 1 Minute hand 2 Time mark 3a Slide pushed in boiler on 3b Slide pulled out boiler o...

Page 9: ...by a pushed in slide and remains on until the timer arrives at a pulled out slide Slide pulled out 3b The boiler is switched off by a pulled out slide and remains off until the timer arrives at a push...

Page 10: ...ler is switched on permanently if set to on The boiler is time controlled according to the slide settings if set to 2 2 Setting the timer Viewing the time of day The time of day is indicated by the nu...

Page 11: ...Setting the heating program Set the slides as desired and set the operating mode switch 5 to the auto matic heating program 2 5 Weekend mode Turn the operating mode switch to on if the boiler is to be...

Page 12: ...lure The set pro gram is retained however The preset program is resumed once the timer is supplied with power again Note After a power failure you must check the time of day and adjust it if necessary...

Page 13: ...of the Low voltage directive Council Directive 2006 95 EC and where Vaillant heating systems are concerned the basic provi sions of the EEC s Electromagnetic com patibility directive Council Directive...

Page 14: ...use is consid ered to be other than intended The manufacturer supplier is not liable for any resulting damage The heating engi neer and or the owner alone bear the risk Intended use includes the obse...

Page 15: ...is responsible for compliance with existing standards and regulations We accept no liability for any damage caused by failure to observe these instructions 5 1 Safety instructions Caution Risk of dam...

Page 16: ...ut by a suitably qualified per son 6 Installation The timer is connected to the boiler by pin header connectors on the timer The timer is pushed directly into the installa tion recess provided for thi...

Page 17: ...Undo the cover from the switch box Check which type of electronics box the boiler has If there are vertical plug connections with pins on the electronics box Carefully press the timer into the con nec...

Page 18: ...ed with the timer into the four horizontal openings on the PCB for the timer 1 Carefully press the timer unit with the pin header connector into the connec tion in the electronics box 7 Start up Switc...

Page 19: ...Please use this checklist Handover Done Hand over any instructions intended for the owner as well as the documents of the appliance and device Go through the operating manual with the owner and answer...

Page 20: ...s Vaillant warranty We only grant a Vaillant manufacturers warranty if a suitably qualified engineer has installed the system in accordance with Vaillant instructions The system owner will be granted...

Page 21: ...r installation manual GB IE Technical data 10 10 Technical data Unit Value Operating voltage V DC 24 Current consumption mA 35 Approx weight g 200 Protection class IP 20 Protection class for controlle...

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ...Reservado el derecho a introducir modificaciones Subject to change Reservado o direito a altera es 838311_04 GBIEESPT 122011 Fabricante Manufacturer Fabricante Proveedor Supplier...

Reviews: