background image

 

 

Document No.: M00-20-6000, Rev. 02 

Issue Date: June 9, 2014 

Supersedes: November 12, 2012 

 
 
 
 
 

 
 
 
M00-20-6000 OPW IP Authorization Gateway 
Procedure Guide 
 

Summary of Contents for M00-20-6000

Page 1: ...Document No M00 20 6000 Rev 02 Issue Date June 9 2014 Supersedes November 12 2012 M00 20 6000 OPW IP Authorization Gateway Procedure Guide ...

Page 2: ...S guidelines by restricting user access to sensitive cardholder data Specific to networks that process bankcards i e Visa MasterCard T Chek Comdata American Express Discover and JCB using the dual serial port convertor and connecting the inbound port to the FSC3000 Fuel Site Controller direct connect serial port Port 1 conflicts with the guidelines described in the M030001_PA1 PA DSS Implementatio...

Page 3: ...thorization Gateway 7 2 3 Verify Network Communications 7 2 4 Connecting the OPW Ethernet IP Authorization Gateway 8 2 5 Testing the OPW Ethernet IP Gateway for Network Authorization 8 2 6 Testing the OPW Ethernet IP Gateway for Inbound Communication 8 2 7 Dial Back up Optional 9 2 8 Troubleshooting 10 3 OPW Cellular Gateway Installation 11 3 1 Cellular Service Activation 11 3 2 Connecting the OPW...

Page 4: ... The OPW Ethernet IP Authorization Gateway when used with the Petro Vend System2 or FSC3000 Fuel Site Controller provides the ability to use a high speed Internet connection to authorize fleet and or credit card transactions This creates a secure outbound IP connection for card authorizations and also allows inbound connections to the fuel site controller The gateway also contains a dial up modem ...

Page 5: ... creates a secure Internet connection to communicate with the card authorization network No inbound connection is available via the cellular connection If installing a Cellular IP Gateway proceed to Section 3 OPW Cellular Gateway Installation of this document 1 3 OPW Cellular Inbound Only Gateway The OPW Cellular Inbound Only Gateway is used in place of a phone modem to communicate with the FSC300...

Page 6: ...ccount IMPORTANT The OPW Site Request Form must be submitted 48 hours prior to your planned install time Prior to installing any version of the Ethernet IP Gateway collect the following information or provide this document to the IT Manager so that the following information can be filled in Is the LAN internal network at the site DHCP enabled dynamic Yes No Are there any outbound port blocking rul...

Page 7: ...2 20 6003 with two 2 20 1517 01 Modem Cables 2 Two standard CAT5 cables For model 20 6000 fill in the appropriate blank fields o CFN Site ID ____________________________ o TCH Site ID ____________________________ o T Chek Site ID ____________________________ You will need appropriate test cards Credit i e MasterCard Visa etc and or fleet cards i e CFN TCH T Chek Fuelman etc for running test transa...

Page 8: ... is configured properly for the processors that will be supported at the site NOTE You are configuring the FSC3000 to work in dial out mode exactly as if you were going to use the new OPW modem and a phone line IMPORTANT For all networks except Buypass configure the modem communication parameters to 2400 baud 7E1 to match the Gateway For the Buypass network configure the modem communication parame...

Page 9: ...e These test transactions will take longer than the high speed transactions as they are running over a phone line instead of an IP connection You should receive a prompt stating Select Pump Enter Pump Number or that the Pump is Activated this indicates that you have received authorization NOTE You do not need to pump fuel at this time 4 Plug the CAT5 Ethernet cable back into the Ethernet IP Author...

Page 10: ... router Verify with your network administrator b Check the status lights on all device s If there is a DSL and or Internet light these should be green c Please record what the status light s on the high speed modem and or router are doing d Please record what the status light on the Ethernet IP Authorization Gateway is doing NOTE You may need to reboot power cycle the high speed modem router and t...

Page 11: ...vice activation and a static IP address must be requested 3 2 Connecting the OPW Cellular IP Authorization Gateway 1 Connect the cellular antenna by connecting it to the MAIN connector on the Cellular IP Gateway 2 Connect the communication cable to the Cellular IP Gateway s serial port and to the correct FSC3000 serial port as follows 20 6005 20 6006 20 6007 20 6008 Connect to COM 5 20 6009 20 601...

Page 12: ...h the Gateway 2 Test the connection by running a test card at the pump You should receive a prompt stating Select Pump Enter Pump Number or that the Pump is Activated this indicates that you have received authorization NOTE You do not need to pump fuel at this time 3 4 Testing the OPW Cellular Inbound Only Communication Using Phoenix or ARTWare establish a connection to the Fuel Site Controller us...

Page 13: ...11 12 CMD 10 COM 5 8 11 Default Gateway 6 DHCP 6 7 DNS 6 Ethernet IP Gateway 3 4 6 8 FSC3000 8 11 High Speed Modem 10 LAN 6 10 MAC Address 7 Network Connectivity 7 10 OPW Help Desk 6 7 9 Outbound 6 8 Phoenix 8 12 Ping 10 Router 7 10 Static IP 6 7 Status Lights 10 Subnet Mask 6 System2 2 8 Troubleshooting 7 10 ...

Reviews: